INITIALIZATION
Knowledgebase: ki-dev
Base Query: "Welche Komponenten sind in der Anfrage für das Automatisierungssystem enthalten?
Tabellarische Auflistung der Antworten wie folgt: Anzahl Lader oder Roboter, Bänder, SPC, Zusätzliche Komponenten, Prozess Steuerungen."
Model: gpt-4-1106-preview
Use Curl?: None
==================================================
QUESTIONING
Clarity Score: 10
Give follow-up?: False
Follow-up query:
==================================================
ROUTING
Query type: list
==================================================
RAG PARAMETERS
Max Context To Include: 100
Lowest Score to Consider: 0.1
==================================================
VECTOR SEARCH ALGORITHM TO USE
Use MMR search?: True
Use Similarity search?: False
==================================================
FILENAMES AND KEYWORDS
Keywords Found: ['SPC', 'steuerungen', 'enthalten']
All file names: ['2024-06-11%20W%C3%B6rterbuch.docx', 'E3.3%20MQTT_MES_Interface%20Functional_Specification_Supplier_v1_1.pdf', 'E2.1%20Electrical%20Questionnaire%20Rotorshaft%20FLT%20v9.1.docx', 'E2.3%20Questionnaire_Tooling.docx', 'Machine_Details_A2253.pptx', 'E4.5%20Project%20manual%20Kistler.pdf', 'E4.6%20Project%20manual%20SEW.pdf', 'E5.0%20Equipment_documentation_requirements.pdf', 'E6.2%20Questionnaire%20KPI%20and%20Principles.xlsx', 'Appendix%20A1.DOC', 'E2.1%20Electrical%20Questionnaire%20Rotorshaft%20FLT%20v9.1.docx', 'E4.5%20Project%20manual%20Kistler.pdf', 'E2.2%20Mechanical%20Questionnaire%20Rotorshaft%20FLT%20v8.1.docx', 'E3.4_MES_Manual_Client_Specification_Supplier_v1_1.pdf', 'E4.5%20Project%20manual%20Kistler.pdf', 'RFQ_FLT_Acknowledgement%20of%20Receipt_2024-03-12.pdf', 'I0%20Handledning%20f%C3%B6r%20Entrepren%C3%B6rer%20och%20Leverant%C3%B6rer.pdf', 'E2.1%20Electrical%20Questionnaire%20Rotorshaft%20FLT%20v9.1.docx', 'B2%20Functional%20description%20Gantry%20Rotorshaft%20MEP.docx', 'E2.2%20Mechanical%20Questionnaire%20Rotorshaft%20FLT%20v8.1.docx', 'E4.3%20Project%20manual_IFM%20electric.pdf', 'E4.4%20Project%20manual%20Festo.pdf', 'E4.8%20Project%20manual%20Cognex%202023.pdf', '2024-06-11%20W%C3%B6rterbuch.docx', 'E4.6%20Project%20manual%20SEW.pdf', 'Appendix%20A2.doc', 'E3.2%20VDcom_v2_2_1_Functional_Specification_Supplier_2.pdf', 'E2.2%20Mechanical%20Questionnaire%20Rotorshaft%20FLT%20v8.1.docx', 'E2.1%20Electrical%20Questionnaire%20Rotorshaft%20FLT%20v9.1.docx', 'E5.0%20Equipment_documentation_requirements.pdf', 'E4.5%20Project%20manual%20Kistler.pdf', 'E5.0%20Equipment_documentation_requirements.pdf', 'E2.2%20Mechanical%20Questionnaire%20Rotorshaft%20FLT%20v8.1.docx', 'E2.3%20Questionnaire_Tooling.docx', 'E4.5%20Project%20manual%20Kistler.pdf', 'E3.5%20OT%20Security%20Conditions%20v1_0.pdf', 'E4.6%20Project%20manual%20SEW.pdf', 'E3.2%20VDcom_v2_2_1_Functional_Specification_Supplier_2.pdf', 'E0%20Technical%20Specification%202023.pdf', 'E5.0%20Equipment_documentation_requirements.pdf', 'E2.3%20Questionnaire_Tooling.docx', 'E4.6%20Project%20manual%20SEW.pdf', 'E3.2%20VDcom_v2_2_1_Functional_Specification_Supplier_2.pdf', 'E3.4_MES_Manual_Client_Specification_Supplier_v1_1.pdf', 'E2.2%20Mechanical%20Questionnaire%20Rotorshaft%20FLT%20v8.1.docx', 'E4.2%20Project%20manual%20Atlas%20Copco.pdf', 'E4.3%20Project%20manual_IFM%20electric.pdf', 'E2.3%20Questionnaire_Tooling.docx', 'E0%20Technical%20Specification%202023.pdf', 'E2.1%20Electrical%20Questionnaire%20Rotorshaft%20FLT%20v9.1.docx', 'E4.5%20Project%20manual%20Kistler.pdf', 'E5.0%20Equipment_documentation_requirements.pdf', 'E4.6%20Project%20manual%20SEW.pdf', 'B0%20Specification%20of%20works%20%28Machining%29.docx', 'E5.0%20Equipment_documentation_requirements.pdf', 'E2.2%20Mechanical%20Questionnaire%20Rotorshaft%20FLT%20v8.1.docx', 'E4.2%20Project%20manual%20Atlas%20Copco.pdf', 'E4.6%20Project%20manual%20SEW.pdf', '2024-06-11%20W%C3%B6rterbuch.docx', 'E5.0%20Equipment_documentation_requirements.pdf', 'E2.1%20Electrical%20Questionnaire%20Rotorshaft%20FLT%20v9.1.docx', 'E5.0%20Equipment_documentation_requirements.pdf', '2024-06-11%20W%C3%B6rterbuch.docx', 'Op100_ERAD_S700271_08.pdf', 'E2.2%20Mechanical%20Questionnaire%20Rotorshaft%20FLT%20v8.1.docx', 'F1%20Checklist%20prior%20Test%20Before%20Shipment.doc', 'E4.4%20Project%20manual%20Festo.pdf', 'E2.1%20Electrical%20Questionnaire%20Rotorshaft%20FLT%20v9.1.docx', 'E2.1%20Electrical%20Questionnaire%20Rotorshaft%20FLT%20v9.1.docx', 'B5%20Tech_SignOff_ProjectXX_SupplierXX_v1.0.docx', 'D0_Obligations%20suppl_purch%20v2.1.docx', 'E4.6%20Project%20manual%20SEW.pdf', 'E1.1%20VCS%208010%2C39%20Safety%20of%20machinery.pdf', 'E2.2%20Mechanical%20Questionnaire%20Rotorshaft%20FLT%20v8.1.docx', 'E4.5%20Project%20manual%20Kistler.pdf', 'E2.3%20Questionnaire_Tooling.docx', 'E2.1%20Electrical%20Questionnaire%20Rotorshaft%20FLT%20v9.1.docx', 'E4.5%20Project%20manual%20Kistler.pdf', 'E3.2%20VDcom_v2_2_1_Functional_Specification_Supplier_2.pdf', 'E3.4_MES_Manual_Client_Specification_Supplier_v1_1.pdf', 'E2.1%20Electrical%20Questionnaire%20Rotorshaft%20FLT%20v9.1.docx', 'B2%20Functional%20description%20Gantry%20Rotorshaft%20MEP.docx', 'E4.2%20Project%20manual%20Atlas%20Copco.pdf', 'E5.2%20Contract%20appendix%20E%20for%202D%20factory%20Layouts%20Aurobay_VCPC_iss5_221123.doc', 'E1.2%20VCS%208003%2C29%20Ergonomic%20requirements.pdf', 'E2.2%20Mechanical%20Questionnaire%20Rotorshaft%20FLT%20v8.1.docx', 'E2.1%20Electrical%20Questionnaire%20Rotorshaft%20FLT%20v9.1.docx', 'E2.1%20Electrical%20Questionnaire%20Rotorshaft%20FLT%20v9.1.docx', 'E2.2%20Mechanical%20Questionnaire%20Rotorshaft%20FLT%20v8.1.docx', 'B2%20Functional%20description%20Gantry%20Rotorshaft%20MEP.docx', 'E4.6%20Project%20manual%20SEW.pdf', 'E2.2%20Mechanical%20Questionnaire%20Rotorshaft%20FLT%20v8.1.docx', 'E2.2%20Mechanical%20Questionnaire%20Rotorshaft%20FLT%20v8.1.docx', 'E0%20Technical%20Specification%202023.pdf', 'B0%20Specification%20of%20works%20%28Machining%29.docx', 'E3.2%20VDcom_v2_2_1_Functional_Specification_Supplier_2.pdf', 'E3.1%20ShopFloor%20Interaction%20Concepts%20v1_0.pdf', 'E1.2%20VCS%208003%2C29%20Ergonomic%20requirements.pdf', 'E3.2%20VDcom_v2_2_1_Functional_Specification_Supplier_2.pdf', 'E2.1%20Electrical%20Questionnaire%20Rotorshaft%20FLT%20v9.1.docx']
File names to FILTER: ['B0%20Specification%20of%20works%20%28Machining%29.docx', 'F1%20Checklist%20prior%20Test%20Before%20Shipment.doc']
==================================================
PRIMER
Primer:
You are a highly intelligent personal assistant. Your role is to act as an expert
at summarization and analysis.
In your responses to enterprise users, prioritize clarity, trustworthiness, and appropriate formality.
Be honest by admitting when a topic falls outside your scope of knowledge, and suggest
alternative avenues for obtaining information when necessary.
Make effective use of chat history to avoid redundancy and enhance response relevance, continuously
adapting to integrate all necessary details in your interactions.
Use as much tokens as possible to provide a detailed response.
==================================================
FINAL QUERY
Final Query: CONTEXT: ##########
File: B0%20Specification%20of%20works%20%28Machining%29.docx
Page: 1
Context: Automation
Suitable type of gantry-loader to be able to load/unload the machines within the specified cycletime.
The supplier will also be handling the RF-id reader/writer and the stops that is located on the conveyor.
The hardware (RF-id reader) will be supplied by a different supplier, but in the quotation the integration for these must be included.
The ASM-module for this shall be included in the quotation.
All gantrys have to communicate with MES.
SPC-place
There should be a SPC-box in each gantry, it will be used for frequent checks and NOK-parts.
It should be possible to re-introduce the parts into the flow by using the SPC, Aurobay will supply a datamatrix-reader (Cognex Dataman 8000-series) that can read the DM-code on the rotorshafts, the supplier must handle the integration of this reader.
Virtual Commissioning
The contractor must in the quotation state if they during design and commissioning phase use Virtual Commissioning as a way of working.
The main purpose of Virtual Commissioning is to shorten the commissioning time by enabling simultaneous activities before physical machine is completed, minimize project risks and reduce the risk for late costly modifications of the equipment.
Aurobay aims to bring activities earlier in the designs and manufacturing process of the equipment, the virtual way of working naturally promotes more remote way of working, which also opens up for more closer collaboration and frequent reconciliations during projects
Equipment specifications
Specification of suppliers
The sub-suppliers to be used, down to station level, must be stated in the quotation.
State the country used for manufacturing, both for main supplier and sub-suppliers.
Functional description
In the Functional description Aurobay is describing the functions of manufacturing equipment.
(See appendix B)
Size protection (Volume)
All machinery and equipment must be designed so that future geometrical changes of the Rotorshaft are protected for, according to the external dimensions given in Figure1 below.
If this drives a more expensive machine, please raise the question to Aurobay before proceeding in the quotation work.
----Image alt text---->A drawing of a tube
Description automatically generated<----media/image1.png----
Figure 1: Rotorshaft
Technical specifications (TS)
According to enclosure TS, the specifications given there, are to be followed.
If something in this inquiry deviate from what is specified in the TS, the specification of this inquiry is valid. (See appendix E).
Clamping, handling and gripping
All surfaces used in any equipment for handling, gripping, clamping etc have to be designed in such a way that the products aren’t damaged.
The surfaces and points that will be used have to be agreed with Aurobay, no other surfaces or points on the product can be used for handling.
Calibration
If quoted equipment includes any components which needs calibration the calibration shall be possible to perform without having to dis
####################
File: B0%20Specification%20of%20works%20%28Machining%29.docx
Page: 1
Context: Contract Appendix B0
General specification
Main Project:
SRS02
Project name:
A2253_Gantrys
Product: Rotorshaft
Version 1.0
Table of content
1 Table of content 2
2 Project presentation 4
2.1 General 4
3 Guidelines for Quotation 5
3.1 Quotation description of content 5
3.2 Matrix for RFQ 5
3.3 Specification of prices 5
4 Scope of supply 6
4.1 Operation sequence 6
4.2 Machines new/re-used 6
4.3 Running philosophy 6
4.4 Automation 7
4.5 SPC-place 7
4.6 Virtual Commissioning 7
5 Equipment specifications 7
5.1 Specification of suppliers 7
5.2 Functional description 7
5.3 Size protection (Volume) 8
5.4 Technical specifications (TS) 8
5.5 Clamping, handling and gripping 8
5.6 Calibration 8
5.7 Component utilization 8
5.8 Risk analysis and CE marking 8
5.9 Manufacturing Execution system – interaction 9
5.10 Cyber Security 9
6 Specific equipment requirements 10
6.1 Hydraulic equipment 10
6.2 Vision system 10
6.3 Emergency location 10
6.4 Changes 10
7 Layout 10
8 Installation 10
8.1 Production media 10
9 Documentation 11
9.1 Gripping touching points 11
10 Capacity 12
10.1 Production time 12
10.2 Cycle time 12
10.3 Technical availability 12
11 Environment and safety 12
11.1 Environment 12
11.2 Ergonomic Assessment 12
11.3 Safety 13
11.4 Work environment demands 13
12 Test parts 13
13 Test before shipment and taking-over test 13
14 Time schedule 13
15 General for machining 13
15.1 Chips (general) 13
15.2 Coolant (general) 14
15.3 Time Calculations and Process Description 14
15.4 Cycle Time Diagram 14
15.5 Special Tools for Machine Adjustments and Maintenance 14
15.6 Spare parts, Option 14
15.7 Choice of colour scheme 14
Project presentation
General
Aurobay has been given the task of manufacturing parts for electric motors called ERAD (ElectricRearAxleDrive) and EFAD (ElectricFrontAxleDrive).
The parts to be manufactured are rotorshafts.
There are geometrical differences between ERAD and EFAD, but they will be manufactured in the same line, without any mechanical change-over.
You are hereby invited to submit a quotation for five load/unload-solutions (gantrys).
The equipment is to be installed at Aurobay, H-factory, Skövde.
The main project is called SRS02 (SkövdeRotorShaft Line #2) and is a second capacity-step.
First capacity-step is the already sourced SRS01.
There’s also a third capacity-step planned, SRS03.
Commercial contact person in the project
Matus Rozvadský
+46701-45 52 07
matus.rozvadsky@aurobay.com
Technical contact person in the project
Nils Tengvall
+46709-61 39 66
nils.tengvall@aurobay.com
####################
File: F1%20Checklist%20prior%20Test%20Before%20Shipment.doc
Page: 1
Context: Checklist prior ‘Test Before Shipment’
This document shall be filled in, signed and sent to the responsible project leader at Aurobay not later than 2 working days and not earlier than 10 working days before the start of the Test before shipment. The answers shall reflect the situation at the start of the Test before shipment.
It is suitable to request a heads up for the status at latest 5 days prior to acceptance test.
This document shall give the supplier a chance to understand which status Aurobay expect that the machine/machines shall be in before the Test before shipment starts. It shall also give Aurobay a chance to know that the machines are ready for Test before shipment.
This checklist does not contain every item that needs to be done by the supplier before the test.
Checklist
Status prior Test Before Shipment planned 20XX-XX-XX
OK NOK N/A
1) The Aurobay ‘Functional test’ has been performed and potential problems have been corrected. ☐ ☐ ☐
2) It has been tested that all machines and equipment in the scope of
supply meets the cycle time requirements from Aurobay. ☐ ☐ ☐
3) Cycle time for the machining centres are according to the time
calculations ☐ ☐ ☐
4) All labels are mounted on their places on the machines. ☐ ☐ ☐
5) The translation into agreed language are completed for screens, alarms,
hard keys and labels. ☐ ☐ ☐
6) Parts of all variants have been tested in all machines and the
results are according to specifications and that the supplier can state that there is an fair probability to reach the capability. ☐ ☐ ☐
7) All handling equipment (gantries, conveyors etc) have been tested
with parts of all variants. ☐ ☐ ☐
8) All fluids and mediums (e.g. cutting fluid, cooling water, pressurised air)
are connected to sources with intended capacity. ☐ ☐ ☐
9) The return pump is connected and running. ☐ ☐ ☐
10) All waste trays (Gantry, SPC, Conveyor) are mounted as intended. ☐ ☐ ☐
Supplier comments:
Date:
Signature:
##########
"""QUERY: "Welche Komponenten sind in der Anfrage für das Automatisierungssystem enthalten?
Tabellarische Auflistung der Antworten wie folgt: Anzahl Lader oder Roboter, Bänder, SPC, Zusätzliche Komponenten, Prozess Steuerungen.""""
Consider the chat history for relevant information. Use all information included. Use as much tokens as needed.
Final Files Sources: B0%20Specification%20of%20works%20%28Machining%29.docx - Page 1, F1%20Checklist%20prior%20Test%20Before%20Shipment.doc - Page 1
==================================================
FINAL ANSWER
Answer: Bas
==================================================