INITIALIZATION
Knowledgebase: ki-dev
Base Query: what is the content about
Model: gemini-1.5-pro-preview-0409
Use Curl?: None
==================================================
**Elapsed Time: 0.00 seconds**
==================================================
ROUTING
Query type: summary
==================================================
**Elapsed Time: 1.92 seconds**
==================================================
RAG PARAMETERS
Max Context To Include: 100
Lowest Score to Consider: 0.1
==================================================
**Elapsed Time: 0.14 seconds**
==================================================
VECTOR SEARCH ALGORITHM TO USE
Use MMR search?: True
Use Similarity search?: False
==================================================
**Elapsed Time: 0.10 seconds**
==================================================
VECTOR SEARCH DONE
==================================================
**Elapsed Time: 4.81 seconds**
==================================================
FILENAMES AND KEYWORDS
Keywords Found: []
All file names: ['Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls', 'dictionary.txt', 'Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls', 'DD_Block_Head_Automation_Inquiry_100424.pdf', 'Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls', '240328_Lastenheft_Automation_Zukauf.pdf', 'Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls', 'Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls', 'Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls', '2024-07-25%20Wo%CC%88rterbuch_extern-update.docx', '2024-07-25%20Wo%CC%88rterbuch_extern-update.docx', 'Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls', 'Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls', 'Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls', 'Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls', 'Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls', 'DD_Block_Head_Automation_Inquiry_100424.pdf', 'Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls', 'Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls', 'Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls', 'DD_Block_Head_Automation_Inquiry_100424.pdf', 'Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls', 'Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls', 'Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls', 'Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls', 'Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls', 'Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls', '240328_Lastenheft_Automation_Zukauf.pdf', 'Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls', 'DD_Block_Head_Automation_Inquiry_100424.pdf', '240328_Lastenheft_Automation_Zukauf.pdf', 'Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls', 'Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls', 'Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls', 'Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls', 'Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls', 'Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls', 'DD_Block_Head_Automation_Inquiry_100424.pdf', 'Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls', 'Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls', 'Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls', 'Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls', 'DD_Block_Head_Automation_Inquiry_100424.pdf', 'Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls', 'DD_Block_Head_Automation_Inquiry_100424.pdf', 'Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls', 'Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls', 'Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls', 'Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls', 'Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls', 'Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls', 'Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls', 'Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls', 'Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls', 'Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls', 'Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls', 'Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls', 'Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls', 'DD_Block_Head_Automation_Inquiry_100424.pdf', 'Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls', '240328_Lastenheft_Automation_Zukauf.pdf', 'Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls', 'Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls', 'Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls', 'Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls', 'DD_Block_Head_Automation_Inquiry_100424.pdf', 'Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls', 'Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls', 'Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls', 'Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls', 'Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls', 'Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls', 'Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls', 'Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls', 'Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls', '240328_Lastenheft_Automation_Zukauf.pdf', 'Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls', 'Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls', 'Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls', 'Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls', '240328_Lastenheft_Automation_Zukauf.pdf', 'Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls', 'Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls', 'Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls', '240328_Lastenheft_Automation_Zukauf.pdf', 'Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls', 'Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls', '240328_Lastenheft_Automation_Zukauf.pdf', 'Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls', 'DD_Block_Head_Automation_Inquiry_100424.pdf', 'Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls', '240328_Lastenheft_Automation_Zukauf.pdf', 'Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls', 'Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls', 'Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls', 'Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls', 'Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls', 'Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls', '240328_Lastenheft_Automation_Zukauf.pdf', 'Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls']
File names to FILTER: []
==================================================
**Elapsed Time: 1.03 seconds**
==================================================
PRIMER
Primer:
You are Simon, a highly intelligent personal assistant in a system called KIOS. You are a chatbot that
can read knowledgebases through the "CONTEXT" that is included in the user's chat message.
Your role is to act as an expert at summarization and analysis.
In your responses to enterprise users, prioritize clarity, trustworthiness, and appropriate formality.
Be honest by admitting when a topic falls outside your scope of knowledge, and suggest
alternative avenues for obtaining information when necessary.
Make effective use of chat history to avoid redundancy and enhance response relevance, continuously
adapting to integrate all necessary details in your interactions.
Use as much tokens as possible to provide a detailed response.
==================================================
**Elapsed Time: 0.00 seconds**
==================================================
FINAL QUERY
Final Query: CONTEXT: ##########
File: Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls
Page: 0
Context: | | | 按照U95标准不确定度小于20%(Ra<0.8)。 | According to the standard U95, the uncertainty is less than 20% (Ra<0.8).
####################
File: Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls
Page: 0
Context: | | | 3.1 工序流程应安排合理完整,充分考虑前后工序的相关性和相互影响,合理布置零件定位基准位置和夹紧点位置,充分考虑加工过程中工件变形的影响,确保产品质量。结合产品结构及质量要求,合理确定各工序加工内容,并使工序节拍尽可能均衡。 | 3.1 The process flow should be arranged reasonably and completely, fully considering the correlation and mutual influence between the previous and next processes, reasonably arranging the positioning reference position and clamping position of the workpiece, fully considering the impact of workpiece deformation during the processing, and ensuring product quality. Reasonably determine the processing content of each process based on the structure and quality requirements of the workpiece, and make the cycle time of each process as balanced as possible. |
| | | 3.2 零件的加工内容及精度见附件2《新中型产品缸盖图纸》、附件3《新中型产品缸盖工艺附图》,工
####################
File: Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls
Page: 0
Context: | | | 10.1.17 包装及运输费用 | 10.1.17 Quotation for packaging and transportation
####################
File: Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls
Page: 0
Context: | | | 2.7 业主提供切削液集中处理系统参数: | 2.7 The parameters of coolant centralized treatment system is proveded by the owner.
####################
File: Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls
Page: 0
Context: | | | 接触器:品牌标准参照或相当于SIEMENS、SCHNEIDER、ABB等国际一流知名品牌产品 | Contactor: reference or equivalent to international first-class brand products such as SIEMENS, SCHNEIDER, ABB, etc
####################
File: Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls
Page: 0
Context: | | | 5.2.3 全部辅助材料(液压油、润滑油、冷却液等)的牌号、用量、化学成分及性能资料。 | 5.2.3 The brand, use amount, chemical composition, and performance data of all auxiliary materials (hydraulic oil, lubricating oil, coolant, etc.). |
|
####################
File: Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls
Page: 0
Context: | | | a. 配有标准的PC键盘的接口;数控键盘,防护等级IP65。需要有控制操作权限的钥匙,三级或三级以上保护。控制权限采用EKS或RFID TAG用于工业场合的电子权限管理,电子钥匙可自由编程,可自由读写,并有各自的唯一序列号。 具有电池缺电报警指示或信息。设备自动循环状态默认100%倍率。电子钥匙配置数量每种权限配置数量如下: | a. Equipped with standard PC keyboard interface. CNC keyboard, protection level is IP65. A key with control operation permissions and level 3 or above protection is required. Control permissions use EKS or RFID TAG for electronic permission management in industrial settings. Electronic keys can be freely programmed, read and written, and have their own unique serial numbers. Has battery low power alarm indication or information. The device's automatic cycle state defaults to 100% magnification. The quantity of the electronic key for each permission is as follows: |
| | | 权限定义:初级操作权限
颜色:设备供应商提供颜色定义,最终在方案会审确定
最低配置数量:4
备注:需配备权限钥匙编辑器1个
####################
File: Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls
Page: 0
Context: | | | 4.1.1.13 设备工作区域设置冲屑装置,空间内无铁屑堆积死角。 | 4.1.1.13 Install a chip cleaning device in the working area of the machine to ensure that there are no dead corners where the chips can accumulate.
####################
File: Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls
Page: 0
Context: | | | 5.3.3 设备总图、夹具总图、其它部件总图,总图需清晰表述部件结构,非标部件(为业主专门设计的图纸)还需提供零件图。设备丝杠、滑台、主轴箱、工作台、刀具库等运动部件至少提供满足维护、维修用的图纸。其它按投标方标准应该提供的资料。 | 5.3.3 Equipment general diagram, fixture general diagram, and other component general diagram. The general diagram should clearly describe the component structure. The non-standard components (drawings specially designed for the owner) need to provide the part drawings additionally. At least provide the drawings for maintenance and repair of moving parts such as screws, slide tables, spindle boxes, work tables, and tool magazines. Other data shall be provided according to the bidder's standards. |
| | | 5.3.4电气及控制原理图﹑I/O地址图﹑设备电器安装图﹑接线图﹑一些集成度较高的电气部件的原理
####################
File: Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls
Page: 0
Context: | | | 3.11.11.2 投标方负责排放管的安装以及与屋顶之间的固定(利用固定点),同时做好开口处的管道安装后屋面二次防水盖板,确保屋面开口处的防雨效果(无渗漏)。 | 3.11.11.2 The bidder is responsible for the installation of the discharge pipe and the fixation between it and the roof (using fixing points). At the same time, responsible for the installation of pipes at the roof opening and the installation of secondary waterproof cover plates on the roof to ensure the rainproof effect (no leakage). |
| | | 第四部分 设备、
####################
File: Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls
Page: 0
Context: | | | d. 刀具寿命控制。 | d. Tool life management
####################
File: Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls
Page: 0
Context: | | | 2.1 项目为交钥匙工程,投标方投标时需提供项目工艺方案,包括但不限于平面布置,节拍计算,安调计划,工件输送方案,冷却液、切屑、尘、雾处理方案。 | 2.1 The project is a turnkey project. The bidder shall provide a process proposal for the project, including but not limited to the layout, time study, installation schedule, workpiece conveying, treatment of coolant, chips, dust and mist. |
| | | 投标方除负责新
####################
File: Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls
Page: 0
Context: | | | 1.1.3.8 工艺设计、设备设计及相关技术资料。 | 1.1.3.8 Process design, equipment design, and related technical data.
####################
File: Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls
Page: 0
Context: | | | 9.14 工件缓存方案、工件清洁包方案、集中吸雾系统方案。 | 9.14 Schemes of workpiece buffering, workpiece cleaning package, and centralized mist suction system.
####################
File: Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls
Page: 0
Context: | | | 2.3.2 设备带有数字化信息接口,便于信息联网和传输,能够实现远程操控和故障诊断。 | 2.3.2 The machine tools is equipped with a digital information interface, which facilitates information networking and transmission, and can achieve remote control and fault diagnosis. |
|
####################
File: Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls
Page: 0
Context: | | | 1.1.3.2 合理安排工艺流程,平衡各工序节拍,优化平面布置,优化工件物流输送。 | 1.1.3.2 Reasonably arrange the process flow, balance the cycle time of each process, optimize the layout, and optimize the logistics transportation of workpieces. |
|
####################
File: Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls
Page: 0
Context: | | | 投标方负责在业主现场对业主代表进行电气、机械维修、操作(设备、刀具调测、在线测量)、编程的技术培训。内容包括编程、操作方法及维修技术、常见故障排除等,负责培训业主设备操作人员能够独立完成设备操作、完成零件加工工作。 | The bidder is responsible for providing a technical training on electrical and mechanical maintenance, operation (equipment, tool adjustment, online measurement), and programming to the owner's representative on the owner's site. The training content includes programming, operation methods, maintenance techniques, and common troubleshooting, etc.. The bidder is responsible for training the owner's operators to complete equipment operations and parts processing work independently. |
| | | 第八部分 质保期、附件、备件及售后服务
####################
File: Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls
Page: 0
Context: | | | 设备及主机轮廓尺寸、与主机的分开布置的电控设备(电柜)、液压站、冷却液箱等装置的位置尺寸、操纵台的位置、工件上/下料装置的位置; 电力、冷却液、压缩空气等工艺介质的接点(供点)位置及高度、接头管径、耗量及要求的技术参数;冷却液和切屑(排液)返回口的位置及高度、接头管径和切屑量(Kg/h)。 | The outline dimensions of the equipment and host, the position dimensions of the electrical control equipment (electrical cabinet), hydraulic station, coolant tank and other devices which are arranged separately from the host. The position of the control panel, and the position of the workpiece loading/unloading device. The position, height, joint pipe diameter, consumption, and required technical parameters of the contact points (supply points) for process media such as electricity, coolant, compressed air. Location and height of coolant and chip (discharge) return port, joint diameter, and chip volume (Kg/h). |
| | | 5.1.3 设备安装图(设备、装置及工位器具等安装位置)。
####################
File: Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls
Page: 0
Context: | | | 在测量中每次测量时,都要将实际值与初始值的公差带比较。每次测量后通过使用行程超程测试,及时校订零点历史纪录。 | During each measurement, the tolerance zone between the actual value and the initial value should be compared. After each measurement, use a travel over range test to promptly correct the zero point history record. |
| |
####################
File: Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls
Page: 0
Context: | Unnamed: 0 | Unnamed: 1 | Unnamed: 2 | Unnamed: 3
####################
File: Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls
Page: 0
Context: | | | 7.1.2.10 在终验收合格投产后,在投标方伴产服务的1个月期间,由业主对刀具寿命(包括100件生产收集到的数据)进行评估统计,对于双方协商一致寿命需要改进的刀具,业主与刀具供应商应共同尽力配合, 投标方负责协调刀具供应方的现场服务并提供支持。 | 7.1.2.10 After the final acceptance is qualified and put into operation, during the one month period of the bidder's accompanying production service, the owner shall evaluate and statistically analyze the tool life (including data collected from 100 pieces of production). For the tools that require improvement in uselife as agreed upon by both parties, the owner and the tool supplier shall make joint efforts to cooperate. The bidder is responsible for coordinating the on-site service of the tool supplier and providing support. |
| | | 7.1.3 验收试件
####################
File: Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls
Page: 0
Context: | | | 7.1.1.5 各项精度合格后进行零件加工验收, 应保证在机床和工装无故障、加工中不进行人工调整前提下,每工序中的1台设备连续切削30件CA6DG1缸盖, 100%采用三坐标测量机检测,按“3.8 设备能力要求”验收Cmk等,连续切削10件6DH2缸盖和5件CA4DG1缸盖,15件全检,要求100%合格, 采用三坐标测量机检测;其余设备分别连续切削5件CA4DG1、CA6DG1和6DH2缸盖,15件全检,要求100%合格, 采用三坐标测量机检测。三坐标检测时,圆度和直线度≤0.02、跳动≤0.04、平面度≤0.02的特性使用扫描策略。切削过程中同时进行节拍验证。 | 7.1.1.5 After the accuracy of each item is qualified, the acceptance of part processing should be carried out. It should be ensured that one equipment of each process continuously cuts 30 pieces of CH CA6DG1 without manual adjustment during the machining process, and the 3-coordinate measuring machine provided by the owner should be used for testing of all processed workpieces. Cmk should be accepted according to the "3.8 Equipment Capability Requirements". 10 pieces of CH 6DH2 and 5 pieces of CH CA4DG1 were continuously cut, and all 15 pieces were tested by the 3-coordinate measuring machine, requiring 100% qualification. The remaining equipment continuously cuts 5 pieces of CH CA4DG1, CH CA6DG1, and CB 6DH2, and all 15 pieces were tested by the 3-coordinate measuring machine, requiring 100% qualification.respectively, When using 3-coordinate detection, scanning strategies are used for characteristics such as roundness and straightness ≤ 0.02, runout ≤ 0.04, and flatness ≤ 0.02. Simultaneously circle time verification during the cutting process. |
| | | 7.1.1.6 设备功能性验收,包括操作性、安全性方面的功能性验收。
####################
File: Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls
Page: 0
Context: | | | 5.3.6 电气及控制说明书,包括操作和编程说明﹑连接和接口说明﹑调试和维修指南等。数控系统的相关说明书等。 | 5.3.6 Electrical and control manuals, including operation and programming instructions, connection and interface instructions, commissioning and maintenance manuals, etc. Relevant manuals for CNC systems, etc. |
| |
####################
File: Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls
Page: 0
Context: | | | 4.3.1 刀具的选择以成熟、先进、高效、经济为原则,要求刀具结构安全可靠、更换方便。 | 4.3.1 The selection of cutting tools shall be based on the principles of maturity, advancement, efficiency, and economy. The structure of the cutting tools shall be safe, reliable, and easy to replace. |
|
####################
File: Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls
Page: 0
Context: | | | 附件1: 《新中型缸盖精加工线平面区划图》 | Appendix 1: "Layout Area for Finish Machining Line of New Medium-Sized Cylinder Head"
####################
File: Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls
Page: 1
Context: | 目 录 | | | | | | | | | | | | | | | | | |
| Contents
####################
File: Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls
Page: 1
Context: | 3.11.10.1室外排放要求:排放管高度不得低于15m(从地面起);二级过滤后达到国家标准GB16297-1996《大气污染物综合排放标准》表2中标准要求,非甲烷总烃120mg/ m³,颗粒物120mg/ m³;三级过滤后非甲烷总烃处理效率≥80%。 | | | | | | | | | | | | | | | | | |
| 3.11.10.2室内排放要求:
####################
File: Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls
Page: 1
Context: | 4.2.4夹具转位、定位、分度机构、夹紧机构动作灵活可靠。 | | | | | | | | | | | | | | | | | |
| 4.2.5夹具体要求排屑通畅。
####################
File: Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls
Page: 1
Context: | 2.5.2工序加工完成后,RFID螺钉读写器将加工完成时间、刀具等相关信息写入RFID螺钉,具体详见附件4:《智能制造数据采集功能通用设备技术规范》。 | | | | | | | | | | | | | | | | | |
####################
File: Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls
Page: 1
Context: | a. | 电控柜: | | | | | | | | | | | | | | | | |
|
####################
File: Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls
Page: 1
Context: | 10.1.11 | SPC检测站检测夹具(包括工件回转装置)报价 | | | | | | | | | | | | | | | | |
| 10.1.12
####################
File: Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls
Page: 1
Context: | l) | 接油盘、夹具采用深灰色,色标号为“RAL7011”。 | | | | | | | | | | | | | | | | |
| m)
####################
File: Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls
Page: 1
Context: | 电计量表功能: | | | | | | | | | | | | | | | | | |
| 1)采集分合状态和电流、电度量等电气参量。
####################
File: Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls
Page: 1
Context: | 第七部分 | 验收及培训 | | | | | | | | | | | | | | | | |
| PART VII
####################
File: Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls
Page: 1
Context: | 7.1.2.4 | 终验收期间设备使用的辅助材料由业主提供。 | | | | | | | | | | | | | | | | |
| 7.1.2.5
####################
File: Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls
Page: 1
Context: | 第八部分 质保期、附件、备件及售后服务 | | | | | | | | | | | | | | | | | |
| Part VIII Warranty Period, Accessories, Spare Parts and After-sales Service
####################
File: Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls
Page: 1
Context: | 第六部分 方案会审 | | | | | | | | | | | | | | | | | |
| Part VI Joint Programme Review
####################
File: Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls
Page: 1
Context: | 1.1.3.6包括相邻辅助设备平面布置对接以及辅助设备物流、维修通道设计(辅助设备平面图由业主提供);包括SPC检测不合格或送三坐标检测工件的上下料摇臂吊的平面布置设计,留有合适的安装空间。要配有与相邻辅机相连的机械接口、电气控制接口,并与辅机供应商共同完成并线连接。 | | | | | | | | | | | | | | | | | |
| 1.1.3.7
####################
File: Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls
Page: 1
Context: | 4.3.4铰孔刀具选择原则在刀具直径、结构许可的条件下定位销孔尽可能采用模块化、可调式高速铰刀,使用高精度液压刀柄夹持。 | | | | | | | | | | | | | | | | | |
| 4.3.5刀具配置(按规定的终验收切削完成通过后移交用户的,并与最终通过时的相同)及要求:
####################
File: dictionary.txt
Page: 1
Context: Definitionen:
- Antworten Sie nur mit einer Gemeinde für Kundenstandort. Geben Sie in der Adresse keine zusätzlichen Details wie Fabrik, Gebäude, Werk usw. an.
- Alle groÃen Automobilhersteller (Mercedes-Benz, Porsche, Audi, Volkswagen, MAN usw.) Kundentyp: OEM
- Es muss zwischen Endkunden und dem Kunden unterschieden werden. Der Endkunde beschreibt den Auftragsgeber wo die Automationlösung verbleibt. Der Kunde ist der direkte Auftraggeber. Vorschriften vom Endkunden haben eine höhere Gewichtung. Endkunde und Kunde können, müssen aber nicht gleich sein.
- Für den geschätzten Gesamtumsatz runden Sie auf die nächste Million (MEUR) auf.
- Technische Anforderungen sind als Auflistung anzugeben.
- Die Automationsinhalte sind als Funktionseinhalten darzustellen. Funktionsinhalte beschreiben die einzelnen Funktionen im gesamten Produktionsablauf.
####################
File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls
Page: 0
Context: The coolant is centrally supplied and circulated for filtration through the owner's coolant control system. The coolant and chips are supplied and discharged from above, and the supply pipeline is arranged on the upper chord of the roof truss (at a floor elevation of 7.5m). The main return pipeline adopts a centralized gravity return method and is overhead arranged on both sides of the lower chord column of workshop roof truss (according to the floor elevation of 6.5-7m). The coolant return tank (container) of the machine is equipped with a return impurity pump and a liquid level control device. It is equipped with a low liquid level (the chip pump stops working), a high liquid level (the chip pump starts starting), and an ultra-high alarm liquid level (the inlet electric control valve is closed, and an alarm is triggered at the same time). It is interlocked with the machine to ensure that the coolant does not overflow and to avoid the return impurity pump running empty. The bottom of the return tank is designed to be conical. The coolant and chips are directly sent to the main return pipeline of the coolant through the upper discharge pipeline by the return impurity pump. The switching on and off of the coolant supply and discharge of the machine is independently controlled by the machine itself. Install a 1m pipeline and connecting flange (one pair) at the coolant supply point of the machine. The liquid supply pipeline requires manual valves and electric control valves (with manual valves on top and electric control valves on bottom), and the height of the manual valves should be as convenient for manual operation as possible. The liquid supply requires a flow meter and pressure sensor to be equipped, so that the main control panel of the machine can monitor whether the liquid supply flow and pressure meet the requirements. The drainage pipe of the machine is also equipped with a 1m pipeline and a pair of connecting flanges. The drainage pipeline requires manual valves and electric control valves (with manual valves on top and electric control valves on bottom), and the height of the manual valves should be as convenient for manual operation as possible. A pressure gauge is required for drainage. The return tank should be easy to maintain and clean. In addition, the selection of the return impurity pump should match the conveying capacity of the machine's chips and coolant mixture, as well as the elevation of the return main pipeline. When designing the machines, it is necessary to consider delaying the supply and return of coolant for a period of time after the machining is completed (the return delay should be slightly greater than the supply delay), so that when the machine stops working completely, the remaining coolant and chips in the return tank (container) can be emptied as much as possible. The coolant control system is provided by the owner. The bidder must confirm with the coolant control system contractor or owner the technical para
####################
File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls
Page: 0
Context: | | | 7.2.5 投标方负责设备接口以下设备内部和设备之间的支管线连接。 | 7.2.5 The bidder is responsible for the connection of power branch lines inside the equipment and between the equipment.
####################
File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls
Page: 0
Context: | | | 4.1.4.6.2 软件: | 4.1.4.6.2 Software:
####################
File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls
Page: 0
Context: | | | 5.4 终验收之前提供所有资料的电子文档硬盘和纸质文件。设备终验收完成后一个月内提供在安装、调试及终验收过程中发生变化的与实物相符的资料。 | 5.4 Provide electronic hard drives and paper files of all data before final acceptance. Within one month after the completion of the final acceptance, provide data that are consistent with the actual product and have undergone changes during installation, commissioning, and final acceptance.
####################
File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls
Page: 0
Context: | | | f. 对PLC的输入和输出端必须预留10%的裕量,编程接口不能占用。电柜内线号与图纸的页码相关联,元器件的编号与页码相关联。 | f. The input and output terminals of PLC must have 10% margin reserved and cannot occupy programming interfaces. The wire numbers inside the electrical cabinet are associated with the page numbers of the drawings, and the component numbers are associated with the page numbers.
####################
File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls
Page: 0
Context: | | | 第八部分 质保期、附件、备件及售后服务 | Part VIII Warranty Period, Accessories, Spare Parts and After-sales Service
####################
File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls
Page: 0
Context: | | | 3.10 机床在线检测系统要求 | 3.10 Requirements for online detection system of the machines
####################
File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls
Page: 0
Context: | | | 1.5.2.1 供电情况:采用TN-S形式,如下图,AC380V±10%
频率:50HZ±2% | 1.5.2.1 Power supply: TN-S form, as shown in the following figure, AC380V±10%
Frequency: 50HZ±2%
####################
File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls
Page: 0
Context: | | | 7.1.3.1 预验收试件:CA6DG1缸体90件、CA6DH2缸体20件、CA4DG1缸体10件,业主准备预验收用的试件并以CIF国外港口条款将试件发运到投标方指定的港口,投标方自行负责将试件运到预验收地点。 | 7.1.3.1 Test pieces for pre-acceptance: 90 pieces of CB CA6DG1, 20 pieces of CB CA6DH2, and 10 pieces of CB CA4DG1. The owner prepares the test pieces, and ships them to the port designated by the bidder according to the trade termes of CIF foreign port. The bidder is responsible for transporting the test pieces to the pre-acceptance site.
####################
File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls
Page: 0
Context: | | | 8.3 投标方在中国境内有固定的并已正常运行的售后服务机构及常用备件库,无不良的售后服务记录,具备能在中国境内有培训、编程和维修的条件。 | 8.3 The bidder has a fixed and normally operating after-sales service organization and a commonly used spare parts warehouse in China, with no poor after-sales service records, and has the conditions for training, programming, and maintenance in China.
####################
File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls
Page: 0
Context: | | | 4.1.1.5 各轴行程应有一定的余量(相对提供的工件加工范围)。 | 4.1.1.5 The stroke of each axis should have a certain margin (relative to the provided workpiece processing range).
####################
File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls
Page: 0
Context: | | | 1.4.1 合同签定后12个月(FOB)。 | 1.4.1 12 months after contract signing (FOB)
####################
File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls
Page: 0
Context: | | | 耐用刀辅具2套,如:刀柄等; | 2 sets of durable tool accessories, such as tool holders, etc.
####################
File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls
Page: 0
Context: | | | 7.1.1.9 上述预验收内容合格视为预验收完成。 | 7.1.1.9 After the above content is qualified, it shall be deemed as completion of the pre-acceptance.
####################
File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls
Page: 0
Context: | | | 4.1.1.10 电气、液压、气动、润滑等元器件采用国际一流知名品牌,并在中国有良好服务体系的生产商。数控系统品牌标准参照或相当于SIEMENS、FANUC 、Rexroth Indramat等国际一流知名品牌产品;电控柜品牌标准参照或相当于德国RITTAL(威图)、HOFFMANN(霍夫曼)等国际一流知名品牌产品;液压元件品牌标准参照或相当于REXROTH、PARKER等国际一流知名品牌产品;气动元件品牌标准参照或相当于FESTO、REXROTH等国际一流知名品牌产品;润滑元件品牌标准参照或相当于SKF、德国BIJUR等国际一流知名品牌产品。 | 4.1.1.10 Electrical, hydraulic, pneumatic, lubrication and other components adopt internationally renowned brand products, and the manufacturer shall have a good service system in China. CNC system adopt the product of SIEMENS, FANUC, Rexroth Indramat or equivalent international first-class brand. The electrical cabinet adopt the product of RITTAL (Germany), HOFFMANN (Germany) or equivalent international first-class brand. The hydraulic component adopt the product of REXROTH, PARKER or equivalent international first-class brand. The pneumatic components adopt the product of FESTO, REXROTH or equivalent international first-class brand. The lubrication components adopt the product of SKF, BIJUR (Germany) or equivalent international first-class brand.
####################
File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls
Page: 0
Context: | | | 5.2 下列资料必须在设备预验收后1周内提供给业主(提供电子文档,纸质文档在终验收之前提供): | 5.2 The following data (electronic data) must be provided to the owner within one week after the pre-acceptance (the paper documents shall be provided before the final acceptance):
####################
File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls
Page: 0
Context: | | | 4.1.1.18 切削液采用集中处理方式。切削液回液泵品牌标准参照或相当于BRINKMANN或EVA、EGGER等国际一流知名品牌产品。回液泵要求有碎屑功能,并考虑各工序去除铁屑量及冷却液流量的不同,适当匹配,回液杂质泵的扬程要求15m~20m,保证有充分能力能够将工序所有铁屑和冷却液及时顺利的排出。 | 4.1.1.18 The coolant adopts centralized treatment method. The coolant return pumps adopt the product of BRINKMANN, EVA, EGGER or equivalent international first-class brand. The return pumps should have chip crushing function, and match appropriately according to the different amounts of chips removed and coolant flow rate in each process. The lift of the return pump is 15m-20m, it can discharge all chips and coolant timely and smoothly .
####################
File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls
Page: 0
Context: | | | 9.1 投标方近五年(2019年至今)来的销售业绩及用户清单。 | 9.1 Sales performance and user list of the bidder in the past five years (2019 present)
####################
File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls
Page: 0
Context: | | | 1.1.2 设备用途:用来完成CA4DG1、CA6DH2、CA6DG1气缸体从半成品至成品共线加工。 | 1.1.2 Equipment purpose: used to complete the flexible production of cylinder blocks CA4DG1, CA6DH2, and CA6DG1 from semi-finished products to finished products
####################
File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls
Page: 0
Context: | | | 9.10 各工序的夹具简图,工序定位、夹紧示意图(标明具体部位)。 | 9.10 Fixture schematic diagram, process locating and clamping diagram (indicating specific positions) of each process.
####################
File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls
Page: 0
Context: | | | 5.1 下列资料在设计会审后2周内提供给业主(提供电子文档,纸质文档在终验收之前提供): | 5.1 The following data (electronic data) shall be provided to the owner within 2 weeks after the joint programme review (the paper documents shall be provided before the final acceptance):
####################
File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls
Page: 1
Context: | | 具有15寸的彩色液晶显示器,以数据或图形进行显示。带有RS232数据输出接口和EtherNet/IP以太网网口,以便向上位计算机终端传送各种数据,开放式数据外传,可使测量结果溶入SPC网络管理中,并且可连接打印机,具有合格品、不合格品数统计功能,并能自动显示。测量值、中间值、平均值、标准偏差、S、X-P、X-S控制图和直方图可在测量计算机屏幕上显示,统计分析使用Q-DAS软件(当前最新版本)。提供错误报警信息并配有计数器,统计出被检零件的总数、合格品数、不合格品数。 | | | | | | | | | | | | | | | | |
|
####################
File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls
Page: 1
Context: | 1.5.1.1 | 厂房屋架下弦距地面高度 :8m | | | | | | | | | | | | | | | | |
| 1.5.1.2
####################
File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls
Page: 1
Context: | CA4DG1 | 气缸体总成 | 1002015-82F_C | | | | | | | | | | | | | | | |
|
####################
File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls
Page: 1
Context: | 提供机床按出厂标准检测的各精度指标的检验报告。至少提供3套完整纸质资料(程序为英文或中文,其它资料为中文和英文),并提供相应的电子文档三套光盘和三套移动硬盘(表格、外购件、备件及易损件清单采用Excel格式;机械图纸提供二维和三维2种格式文件:二维图纸采用AutoCAD 2014格式和PDF两种格式;PLC程序梯形图采用ZIP格式;NC程序采用WORD格式;其余资料采用PDF格式。 | | | | | | | | | | | | | | | | | |
|
####################
File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls
Page: 1
Context: | 6.3.8零件输送方案(工序间及工序内)。 | | | | | | | | | | | | | | | | | |
| 6.3.9冷却液及切屑供排和集中吸雾系统设计方案。
####################
File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls
Page: 1
Context: | 10.1.21 | 分别以FOB与CIF报价 | | | | | | | | | | | | | | | | |
| 10.1.22
####################
File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls
Page: 1
Context: | 插座 | AC220V | | | | | | | | | | | | | | | | |
| 标准
####################
File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls
Page: 1
Context: | 编号:2024-2801- | Unnamed: 1 | Unnamed: 2 | Unnamed: 3 | Unnamed: 4 | Unnamed: 5 | Unnamed: 6 | Unnamed: 7 | Unnamed: 8 | Unnamed: 9 | Unnamed: 10 | Unnamed: 11 | Unnamed: 12 | Unnamed: 13 | Unnamed: 14 | Unnamed: 15 | Unnamed: 16 | Unnamed: 17 |
|:----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
####################
File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls
Page: 1
Context: | f. 如采用西门子SINUMERIK 840D sl数控系统,需带有PLC软件,可以查找和修改梯形图(或采用SIEMENS的工业PG进行查找和修改梯形图)。 | | | | | | | | | | | | | | | | | |
| 4.1.4.6.3 数控系统除具备标准功能及工序所必须的附加功能以外,还须具备以下特殊功能:
####################
File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls
Page: 1
Context: | | 设备的机械(导轨、丝杠等)、电气(电机、伺服马达等)、液压、气动、润滑等元器件的主要供应商,输送、上、下料机构的供应商,集中吸雾系统供应商。 | | | | | | | | | | | | | | | | |
|
####################
File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls
Page: 1
Context: | | | | | | | | | | | | | | | | | | |
| 项目
####################
File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls
Page: 1
Context: | 8.5.2提供机床调整用检验棒和调整样件等装置。 | | | | | | | | | | | | | | | | | |
|
####################
File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls
Page: 1
Context: | 3.10.8缸体缸孔测量:直径采用2对互成90°的传感器;分步可编程测量方式,可完成多截面的测量(实际至少3个截面);6个缸孔全部测量和反馈补偿。 | | | | | | | | | | | | | | | | | |
| 3.10.9 测量系统精度指标及要求
####################
File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls
Page: 1
Context: | 项目 | | | 要求 | | | | | | | | | | | | | | |
| 电柜内标牌
####################
File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls
Page: 1
Context: | 1.2.4 | 零件重量: | | | | | | | | | | | | | | | | |
| CA4DG1缸体:
####################
File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls
Page: 1
Context: | 9.20投标方提供总进度及设计和会审、制造、装配、调试、培训及预验收等各阶段时间进度计划。 | | | | | | | | | | | | | | | | | |
| 9.21以上资料同时提供相应的电子文档。
####################
File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls
Page: 1
Context: | Part IV Equipment, Fixture and Tool | | | | | | | | | | | | | | | | | |
|
####################
File: DD_Block_Head_Automation_Inquiry_100424.pdf
Page: 1
Context: 17.04.24 / Ralf Haug
DALIAN DIESEL
BLOCK AND HEAD
AUTOMATION INQUIRY
CMIFSIÄgELSUK
LAVCCHErrv
ae
»
BJ zuchmun
A EuIIBUNDI
CbuluveL
WOBVEV
Fr] wonnr
WECCSUOGOLS
A HJ0B2
o
HE22ubb
ADL BOEHLINGER
####################
File: DD_Block_Head_Automation_Inquiry_100424.pdf
Page: 2
Context: PROJEKTDATEN / PROJECT DATA
29.04.2024
Dalian Diesel Block and Head
2
Kunde:
Dalian Diesel
Werkstück:
Head and Block
Taktzeit:
260s
Time schedule
will follow
RFQ Documents
pre RFQ sheets available
2 separate and independent RFQs / Proposals
Others
Contact MAG purchasing
sonja.haas@mag-ias.com
Contact MAG planning
ralf.haug@mag-ias.com
####################
File: DD_Block_Head_Automation_Inquiry_100424.pdf
Page: 5
Context: LAYOUT FROM CUSTOMER
29.04.2024
Dalian Diesel Block and Head
5
Block area
Head area
####################
File: DD_Block_Head_Automation_Inquiry_100424.pdf
Page: 9
Context: OP100 BLOCK GANTRY
29.04.2024
Dalian Diesel Block and Head
9
Scope
•
H-loader
•
2 vertical axes
•
2 grippers, each with turning axis
•
Concept see following slides
•
Drip pans bewteen the machines
•
Option
•
2 automatic loading hatches for gaging and cleaning station
•
Cell controls Siemens
•
1 HT10
•
Integration of cleaning box
•
Fix mounted maintenance platform with ladder at one gantry end
•
Moveable maintenace platform, mounted on gantry carriage
•
Option
•
Part buffer, 2 parts
•
Test cell at MAG Eislingen
•
Transport, installation and commissioning
•
Transport to customer FOB and CIF
•
Installation and commissioning at customer
•
Documentation and training (Chinese)
apsy poıs
@34\ud cisuK
Ob 140
pox
cjesujua
ps SNE
####################
File: DD_Block_Head_Automation_Inquiry_100424.pdf
Page: 11
Context: OP120 BLOCK CONVEYOR
29.04.2024
Dalian Diesel Block and Head
11
Scope
•
Intermediate conveyor
•
4 PZR sections (length appr. 1.400mm)
•
RFID read/write unit
•
SPC conveyor
•
With semi automatic turntable
•
RFID read/write unit
•
TBD with Dalian - height
•
Outgoing conveyor
•
2 PZR sections (length appr. 1.400mm)
•
„cold“ interface to following conveyor
•
RFID read/write unit
•
All conveyors
•
Part orientation: oil pan down, front face leading
•
controlled by gantry cell controls
•
Safety guarding, sheet metal with maintenance doors
•
Gripper maintenance at SPC guarding
####################
File: DD_Block_Head_Automation_Inquiry_100424.pdf
Page: 13
Context: OP120 BLOCK GRIPPER
29.04.2024
Dalian Diesel Block and Head
13
Front face
Fixture concept
Feasible
Gripper bores
####################
File: DD_Block_Head_Automation_Inquiry_100424.pdf
Page: 14
Context: GANTRY LOAD/UNLOAD POSITION
29.04.2024
Dalian Diesel Block and Head
14
Stop Position
on conveyor
Independant
motorized gripper
strokes on both sides
TBD with DD
Position of RFID Chip
Conveyor
Conveyor
####################
File: DD_Block_Head_Automation_Inquiry_100424.pdf
Page: 16
Context: 29.04.2024
Dalian Diesel Block and Head
16
Head
####################
File: DD_Block_Head_Automation_Inquiry_100424.pdf
Page: 17
Context: LAYOUT HEAD
29.04.2024
Dalian Diesel Block and Head
17
MAG scope
•
4 SPECHT machines
•
1 gantry
•
1 cleaning box
•
1 gaging station
•
1 SPC conveyor
•
Incoming/outgoing conveyor
Dalian Diesel scope
•
SPC
•
- table
•
Crane
•
- fixture
•
hardgages
####################
File: DD_Block_Head_Automation_Inquiry_100424.pdf
Page: 21
Context: CONVEYOR HEAD GUIDING
29.04.2024
Dalian Diesel Block and Head
21
Guiding on
roller conveyor
CONVEYOR HEAD GUIDING
Mac?
Guiding on
roller conveyor
a
‘alan Diesel Block and Head
‘20.04.2026
####################
File: 240328_Lastenheft_Automation_Zukauf.pdf
Page: 2
Context: Automation/Zukauf
Seite 2 von 16
MAG IAS GmbH
Inhaltsverzeichnis
1.
Versionstabelle ............................................................................................................................................... 3
2.
Projektdaten .................................................................................................................................................... 3
3.
Lastenhefte / Kundenspezifikation .................................................................................................................. 4
4.
Terminplan ...................................................................................................................................................... 4
5.
Genehmigungsverfahren ................................................................................................................................ 4
6.
Projektreporting............................................................................................................................................... 5
7.
Datenbereitstellung ......................................................................................................................................... 5
8.
Werkstückbereitstellung .................................................................................................................................. 5
9.
Taktzeit / Beladezeiten / R&M-Daten .............................................................................................................. 5
10.
Hallenlayout ................................................................................................................................................ 6
11.
Konformitätserklärung / Dokumentation ..................................................................................................... 7
11.1
Werkstückberührende Teile ................................................................................................................... 7
11.2
E+V Stücklisten ...................................................................................................................................... 7
12.
Konstruktion ............................................................................................................................................... 8
12.1
Bandtechnik ........................................................................................................................................... 8
12.2
Greifertechnik ......................................................................................................................................... 9
12.3
Portaltechnik ........................................................................................................................................ 10
12.4
SPC-Schubladen .................................................................................................................................. 11
12.5
Roboter ....................
####################
File: 240328_Lastenheft_Automation_Zukauf.pdf
Page: 6
Context: Automation/Zukauf
Seite 6 von 16
MAG IAS GmbH
Der Lieferant muss mit dem Angebot die R&M-Daten bereitstellen. Diese sind technische
Verfügbarkeit und MTTR (meantime to repair).
10.
Hallenlayout
In der Angebotsphase wird definiert, wer für die Planung des Hallenlayouts verantwortlich ist.
Liegt die Layoutplanung in der Verantwortung von MAG, sind vom Lieferanten alle nötigen
Daten (Zellenpläne, Fundamentpläne, …) termingerecht beizustellen. Die Positionierung der
Beladeeinrichtung (LIP, Roboter, …) in Bezug auf die Maschinen obliegt beim Lieferanten,
ebenso die dazugehörende Störkonturuntersuchung. Die unter „Verantwortlichkeit Hallen-
layout Lieferant“ genannten Punkte gelten auch für diesen Abschnitt.
Verantwortlichkeit Hallenlayout Lieferant:
- MAG stellt dem Lieferanten das Angebotslayout zur Verfügung
- Die Hallenplanung / Verantwortung über das Hallenlayout liegt beim Verketter. Dieses
beinhaltet:
• Umfang des Lieferanten
• Umfang MAG
• evtl. Umfang von Fremdgewerken
- Das Hallenlayout ist als DWG (ACAD 2016), PDF und STEP (siehe auch Punkt Zellen-
plan) zur Verfügung zu stellen
- Der Lieferant ist verantwortlich für die Störkonturuntersuchung
- Sämtliche notwendige Daten, sind bei MAG zu erfragen und werden von MAG zur
Verfügung gestellt:
• Hallenhöhe
• Mindestabstände
• Durchgänge
• Wartungsplätze (Portal, Greifer, sonstiges)
• Bandhöhe
• …
- MAG stellt für die Layoutplanung die Daten der Maschine / Fremdgewerke zur
Verfügung. Diese sind termingerecht durch den Lieferanten einzufordern.
- Die Schnittstellenverantwortlichkeit liegt beim Lieferanten (ME + HW + SW)
Die hierfür benötigten Daten von Drittlieferanten werden von MAG bereitgestellt.
- Der Lieferant erstellt einen Gesamtfundamentplan. Die hierzu erforderlichen Daten sind
termingerecht bei MAG einzufordern.
####################
File: 240328_Lastenheft_Automation_Zukauf.pdf
Page: 7
Context: Automation/Zukauf
Seite 7 von 16
MAG IAS GmbH
- Bei mehreren Zellen sind ein Zellenplan (Draufsicht, Seitenansicht, Vorderansicht) und
ein Zellenfundamentplan zu erstellen. Abweichungen sind vorab mit MAG
abzustimmen.
- Die Zellenpläne sind als STEP (keine Flächenmodelle), DWG (ACAD2016) und PDF
zur Verfügung zu stellen, die Fundamentpläne als DWG und PDF.
11.
Konformitätserklärung / Dokumentation
Das Gesamt-CE (Anlagen-CE) oder auch Zellen-CE ist durch den Verketter zu erstellen. Alle
erforderlichen Unterlagen (z.B. Maschinen-CEs) sind termingerecht bei MAG bzw. den
Unterlieferanten einzufordern.
Jeder Maschinenlieferant hat für seine Maschine eine CE-Erklärung zu erstellen. Bei
unvollständigen Maschinen ist eine Einbauerklärung sowie eine Montageanleitung zu liefern
und die Checkliste „unvollständige Maschine“ vorab auszufüllen.
Die Dokumentation erfolgt nach Kundenvorschrift. Sollte eine Prüfung der Dokumentation
durch ein Prüfbüro gefordert sein, so ist dieses durch den Lieferanten für dessen
Lieferumfang zu beauftragen und für die diesbezüglich anfallenden Kosten aufzukommen.
Die Dokumentation ist bei Auslieferung der Anlage alternativ nach MAG-Terminplan über
einen Download-Link bereitzustellen. Änderungen nach Endabnahme sind einzupflegen.
Sollten hier in der Kundenspezifikation Vorgaben gemacht werden, sind diese vorrangig zu
betrachten und umzusetzen z.B. Doku zur Versandfreigabe bzw. Vorabnahme.
Die Dokumentation ist, wenn nach Endkundenlastenheft nicht anders gefordert, in der
jeweiligen Landessprache und in Englisch auszuführen.
11.1 Werkstückberührende Teile
- Von allen werkstückberührenden Teilen sind die Fertigungszeichnungen zu liefern; die
Daten sind als PDF und DWG (ACAD2016) bereitzustellen.
- Die Zuordnung aller werkstückberührenden Teile muss über mitgelieferte Stücklisten
und Zusammenstellungszeichnungen nachvollziehbar sein.
11.2 E+V Stücklisten
Alle E+V-Stücklisten sind mit Herstellerangaben und Preisen im Kundenformat zu liefern.
####################
File: 240328_Lastenheft_Automation_Zukauf.pdf
Page: 8
Context: Automation/Zukauf
Seite 8 von 16
MAG IAS GmbH
12.
Konstruktion
Die Verantwortung für die konstruktive Auslegung und die sichere Funktion der gesamten
Automation liegt beim Lieferanten. Erforderliche Daten für eine Störkonturuntersuchung sind
termingerecht bei MAG einzufordern.
12.1 Bandtechnik
- Für die sichere Ausführung und Funktion ist der Lieferant verantwortlich
- Bandgeschwindigkeit nach Vorgabe des Endkunden, wenn keine Vorgabe, dann
Auslegung nach Taktzeit
- Bandhöhe nach Vorgabe des Endkunden
- Der Lieferant bestätigt das sichere Greifen und Ablegen des Bauteils auf dem Band.
(Sind hierfür Aushub- oder Indexier-Stationen notwendig, sind diese vorzusehen.)
- Der Lieferant bestätigt ein sicheres Lesen des DMC-Codes bzw. des RFID-Chips.
(Eventuelle Zustelleinheiten und Indexier-Stationen sind zu berücksichtigen.)
Bsp. für Fehllesung DMC
Bei dreimaliger Fehllesung des DMC-Codes, muss das Teil aus der Anlage genommen werden.
Dies kann entweder manuell über eine entsprechend große Zugangstüre im Abholschacht, oder
durch ein Ausschleusen mit reduzierter Geschwindigkeit (evtl. im Zustimmbetrieb) auf den SPC-
Platz erfolgen. Hierzu muss dann die Seriennummer des Bauteils über das HMI eingegeben
werden, damit die Anlage weiß, welches Bauteil sich im Abholbereich befindet. Dieser Ablauf ist
vorab mit dem Endkunden zu klären!
- Bandführung: Das Konzept und die Ausarbeitung über die Führung des Werkstücks auf
dem Band haben durch den Lieferanten zu erfolgen. Die Genehmigung erfolgt über
MAG mit dem Endkunden.
- Späne-/KSS-Auffangwannen sind mit Schrägen und Ablassschrauben auszuführen.
- Der Lieferant bestätigt eine Tropfwannenausführung, die gewährleistet, dass der
Boden nicht verschmutzt wird. Kabelkanäle und Medieneinheiten sind außerhalb des
Nassbereiches anzuordnen.
- Ein-/Auslaufschacht:
Nassbearbeitung:
Blech oder Makrolon
Trockenbearbeitung:
Schutzgitter
Zugangstüre, elektr. abgesichert (z.B. Euchner MGB)
- Bandzeichnungen sind als STEP (kein Flächenmodell), DWG (ACAD2016) und PDF zu
liefern, inkl. Werkstück. Die Werkstückführung muss ersichtlich sein und die Funktion
der Lichtschranken bzw. Sensorik erkenntlich sein.
- Allgemeine Unklarheiten sind im Vorfeld mit MAG abzustimmen. Kosten, die im
Nachgang hierfür entstehen, werden nicht durch MAG übernommen.
####################
File: 240328_Lastenheft_Automation_Zukauf.pdf
Page: 9
Context: Automation/Zukauf
Seite 9 von 16
MAG IAS GmbH
12.2 Greifertechnik
Die Greifer werden durch den Lieferanten beschafft. Dieser ist für das Greifkonzept
(pneumatisch oder elektrisch), die sichere Ausführung und Funktion der Greifer
verantwortlich.
- Greifkraftsicherung bei Medienausfall gegen Werkstückverlust
- Sichere Signalgebung z.B. Dauersignal bei Werkstück-Vorhanden, um einen Verlust
des Werkstücks zu erkennen; keine Signalspeicherung!
- Abfragen von Greifer gelöst, gespannt mit WST, gespannt ohne WST
- Abfrage Werkstück-Vorhanden, bevorzugt über Federstößel
- Druckschalter für Klemmungen
- A-Achsen, C-Achsen und Y-Achsen sind als NC-Achsen auszuführen
- Werkstückberührende Teile sowie Ersatz- und Verschleißteile müssen schnell
wechselbar sein
- Bei Nassbearbeitung ist eine A-Achse (NC-Achse) im Greifer vorzusehen, um das
Werkstück auskübeln zu können
- Greiferzeichnungen sind als STEP (kein Flächenmodell), DWG (ACAD2016) und PDF
zu liefern. Darzustellen sind:
• Greifer offen; Greifer zu; inkl. Werkstück
• Greifergewicht, Abmaße
• Funktionsmaße (Hübe, Passmaße, Toleranzen, …)
• Greifkräfte
• Belade- / Entlade-/ Maschinenübergabepositionen
• Abfragen inkl. Sensortypen, Bezeichnungen von Kauf- und Standardteilen wie
z.B. Parallelgreifer, Linearzylinder, …
• Funktion der Abfragen
• Transportrichtung
Sofern vom Endkunden keine Greifpunkte vorgegeben werden, sind diese durch den
Lieferanten vorzuschlagen und gemeinsam mit MAG beim Endkunden zu genehmigen.
Die Störkonturuntersuchung zwischen Greifer, Maschine und Vorrichtung obliegt dem
Lieferanten. Alle notwendigen Daten sind termingerecht anzufordern und durch MAG
bereitzustellen.
Allgemeine Unklarheiten sind im Vorfeld mit MAG abzustimmen. Kosten, die im Nachgang
hierfür entstehen, werden nicht durch MAG übernommen.
####################
File: 240328_Lastenheft_Automation_Zukauf.pdf
Page: 10
Context: Automation/Zukauf
Seite 10 von 16
MAG IAS GmbH
12.3 Portaltechnik
Die LIPs haben hinsichtlich technischer Ausführung folgende Anforderungen zu erfüllen:
- Folgende Daten sind bereitzustellen:
• Wiederholgenauigkeit der Achsen inkl. Greifer
• Verfahrwege und Achsgeschwindigkeiten
- Positioniergenauigkeit Be-/Entladen Spannvorrichtung:
+/- 0,1 mm
- Durchschlagsichere Ladeluken und Portalwannen sind notwendig
- Der Lieferant bestätigt eine Tropfwannenausführung, die gewährleistet, dass der
Boden nicht verschmutzt wird. Kabelkanäle und Medieneinheiten sind außerhalb des
Nassbereiches anzuordnen.
- Die Tropfwannen sind mit Schrägen und Ablassschrauben auszuführen, damit im
Nachgang eine eventuelle KSS-Rückführung angeschlossen werden kann.
- Werkstückablageplätze sind so auszuführen, dass keine Späne auf den Flächen,
Auflagen und Aufnahmepins liegen bleiben. Eventuelle Maßnahmen sind vorzusehen.
- Ersatz- und Verschleißteile müssen einfach und schnell wechselbar sein
- Fundamentplatten sind mitzuliefern
- Die Portalhöhe ist so zu definieren, dass Maschinen unter dem Portal durchgeschoben
werden können, sofern die Hallenhöhe dies zulässt. Grobe Richtwerte für Panzerrollen
zur Maschineneinbringung sind 120 mm (manuell) und 180 mm für elektrisch
angetriebene.
- Ab einer Portallänge von 22 m ist eine Temperaturkompensation in der X-Achse
vorzusehen
- X- und Z-Achsen sind als Servo-Achsen auszuführen, ebenso die A-, B- und C-
Achsen; die Y-Achsen bevorzugt als Servo-Achse
- Allgemeine Unklarheiten sind im Vorfeld mit MAG abzustimmen. Kosten, die im
Nachgang hierfür entstehen, werden nicht durch MAG übernommen.
####################
File: 240328_Lastenheft_Automation_Zukauf.pdf
Page: 11
Context: Automation/Zukauf
Seite 11 von 16
MAG IAS GmbH
12.4 SPC-Schubladen
Konstruktive Gestaltung der der SPC-Schubladen:
- 1x Schutztüre mit Schutztürschalter z.B. Euchner MGB
- 2x Sicherheitsschalter mit Zuhaltung (Schublade sicher geöffnet, Schublade sicher
geschlossen) pro Schublade
- 1x mechanische Verriegelung pro Schublade für Schublade geöffnet/geschlossen
(federndes Druckstück)
- 1x Werkstück-Vorhanden-Kontrolle pro Werkstück
- 1x Handscanner
- Schubladenauszug pro Werkstück (Ergonomie/Zugänglichkeit)
- Steckbleche für die Greiferwartung (Zugänglichkeit)
- Leuchte
- Bedienelement (Leuchtdrucktaster weiß)
- Umhausung in Blech oder Makrolon
- Sicheres teachen der Werkstücke ohne Demontage
- Späne-/KSS-Auffangwannen sind mit Schrägen und Ablassschrauben auszuführen.
- Der Lieferant bestätigt eine Tropfwannenausführung, die gewährleistet, dass der
Hallenboden nicht verschmutzt wird. Kabelkanäle und Medieneinheiten sind außerhalb
des Nassbereiches anzuordnen.
- Werkstückablageplätze sind so auszuführen, dass keine Späne auf den Flächen,
Auflagen und Aufnahmepins liegen bleiben. Eventuelle Maßnahmen sind vorzusehen.
- Allgemeine Unklarheiten sind im Vorfeld mit MAG abzustimmen. Kosten, die im
Nachgang hierfür entstehen, werden nicht durch MAG übernommen.
####################
File: 240328_Lastenheft_Automation_Zukauf.pdf
Page: 13
Context: Automation/Zukauf
Seite 13 von 16
MAG IAS GmbH
13
Steuerungskonzept / Ablaufbeschreibung
Das Steuerungskonzept ist vom Lieferanten zu erstellen und mit MAG abzustimmen. Dieses
muss vom Endkunden genehmigt werden. Ebenso wie alle Regel- und Sonderabläufe.
14
Hallenanriss / Maschineneinbringung
Die Maschineneinbringung erfolgt, wenn nicht anders mit dem Endkunden abgestimmt,
durch den Lieferanten – ebenso der Hallenanriss, das Verlegen und Befestigen der
Fundamentplatten/Komponenten sowie das Verschweißen der Ständer auf den
Fundamentplatten. Alle benötigten Hilfsmittel sind durch den Lieferanten bereitzustellen.
15
Montage und Inbetriebnahme
Die Montage, elektrische und pneumatische Installation sowie die Inbetriebnahme erfolgen
durch den Lieferanten. Sämtliche Hilfsmittel wie Hebebühnen, Stapler, Hubwagen usw. sind
durch den Lieferanten bereitzustellen.
16
Instandhaltungskonzept
Der Lieferant ist für die Wartung innerhalb seines Lieferumfangs verantwortlich. Ein
Verschieben auf ein Fremdgewerk ist nicht zulässig!
- Wartungsplattformen sind vorzusehen
siehe hierzu Lastenheft Kunde, wenn keine Vorgabe, ist nach Rücksprache MAG eine
starre oder mobile Plattform zu verwenden. Ein Sicherheitskonzept ist zu berück-
sichtigen und aufzuzeigen.
- Greiferwartungsplätze sind vorzusehen (z.B. SPC-Platz oder Be-/Entladeschacht)
Zugänglichkeit muss sichergestellt sein (mind. eine elektr. abgesicherte Zugangstüre;
Steckbleche)
- Das Wartungskonzept muss in der Betriebsanleitung ersichtlich sein
- Die Wartungsplätze sind im Hallenlayout darzustellen
- Eine Ablaufbeschreibung speziell zum Austausch der Motoren (X, Y, Z) ist vorzulegen
- Der Austausch aller Ersatz- und Verschleißteile muss ersichtlich und beschrieben sein
- Das Ersatzteilpaket hat alle notwendigen Ersatz- und Verschleißteile sowie
werkstückberührende Teile inkl. Preis, Lieferzeiten und Herstellerangaben zu
beinhalten; siehe auch unter „Dokumentation“
- Werkstückberührende Teile müssen einfach und schnell wechselbar sein
-
…
####################
File: 240328_Lastenheft_Automation_Zukauf.pdf
Page: 14
Context: Automation/Zukauf
Seite 14 von 16
MAG IAS GmbH
17
Kommunikation / Kontakte
Der Lieferant kommuniziert direkt mit dem Endkunden und nimmt MAG bei allen Emails mit
in CC. Somit soll der direkte Informationsaustausch sichergestellt werden. Bei allen
technischen Durchsprachen sowie Genehmigungsdurchsprachen hat der Lieferant mit den
entsprechenden Fachabteilungen teilzunehmen – sowohl bei Präsenz- als auch bei Online-
Veranstaltungen.
18
Protokollführung
Die Protokollführung liegt beim Lieferanten! Dieses ist einen Tag nach der Besprechung
bereitzustellen.
19
Nachträge
Auftragsänderungen sind vorab abzustimmen und anzumelden. Erst nach schriftlicher
Freigabe durch MAG dürfen diese konstruktiv umgesetzt werden. Für Änderungen, die nicht
schriftlich durch MAG freigegeben werden, trägt der Lieferant die Kosten! Ein Richtpreis ist
innerhalb von drei Tagen bereitzustellen.
####################
File: 240328_Lastenheft_Automation_Zukauf.pdf
Page: 16
Context: Automation/Zukauf
Seite 16 von 16
MAG IAS GmbH
20.7 Technical Compliance
Name:
Martin Kohnle
Tel:
+49 7161 / 805 3608
E-Mail:
martin.kohnle@mag-ias.com
21
Abweichungen Lastenhefte
Abweichungen von Kunden- und MAG-Lastenheften müssen durch den Lieferanten in einer
separaten Auflistung im Angebot mit Alternativen aufzeigt, begründet und anschließend von
MAG schriftlich freigegeben werden!
####################
File: 2024-07-25%20Wo%CC%88rterbuch_extern-update.docx
Page: 1
Context: | Auftragsnummer | Kunde | Enkunde | Verkettung/Produkt/Umbau | Werkstücktyp | Werkstückgewicht | Prozess |
| -------- | -------- | -------- | -------- | -------- | -------- | -------- |
3037560 | Mercedes Benz | Mercedes Benz | Verlettung | Kurbelwelle | 20 | Handling |
3036337 | MAG | Lovol | Projekt | Zylinderblock | 60 | Handling |
3035132 | Läppler Automotive | Läpple | Verkettung | | | Schweißen |
3035288 | Sturm | BMW | Projekt | Zylinderblock | 40 | Handling |
3036885 | Läpple Automotive | Läpple Automotive | Verkettung | | | Schweißen |
3035671 | MAG | BMW Steyr | Projekt | Gehäuse E- Motor | 25 | Handling |
3035831 | Mercedes Benz AG | Mercedes Benz | Verlettung | Zylinderblock | 20 | Handling |
3035580 | Mercedes Benz Poland | Mercedes Benz | Verlettung | Kurbelwelle | 20 | Handling |
3035267 | Sturm | VW Changchun | Projekt | Zylinderblock | 40 | Handling |
3035818 | Tesla | Tesla Grünheide | Projekt | Rotor | | Handling |
3037321 | Mercedes-Benz | Mercedes Benz | Verlettung | Batterie | | Handling |
3035950 | Läppler Automotive | Läpple Automotive | Verkettung | | | Schweißen |
3037560 | Mercedes Benz | Mercedes Benz | Verlettung | Batterie | | Handling |
3036886 | Läpple Automotive | Läpple Automotive | Verkettung | | | Schweißen |
3037162 | Läpple Automotive | Läpple Automotive | Verkettung | | | Schweißen |
3036674 | Läpple Automotive | Läpple Automotive | Verkettung | | | Schweißen |
3037164 | Läpple Automotive | Läpple Automotive | Verkettung | | | Schweißen |
3036955 | Läpple Automotive | Daimler Truck | Verkettung | | | Schweißen |
3034548 | MAG | VW Chemnitz | Kleinprojekt | Zylinderkopf | 25 | Handling |
3037121 | Mercedes Benz | Mercedes Benz | Verlettung | Kurbelwelle | 20 | Handling |
3038186 | MAG | VW | Kleinprojekt | Getriebe | 25 | Handling |
3036674 | Läpple Automotive | Läpple Automotive | Verkettung | | | Schweißen |
3036917 | Läpple Automotive | Läpple Automotive | Verkettung | | | Schweißen |
3037002 | Still | Still | Verkettung | Hubmast | | Schweißen |
3037199 | MAG | VW Kassel | Projekt | Getriebegehäuse | 25 | Handling |
3037493 | Mercedes Benz | Mercedes Benz | Verlettung | Zylinderblock | 20 | Handling |
3037701 | MAG | VW Kassel | Projekt | Getriebegehäuse | 25 | Handling |
3037246 | Mercedes Benz | Mercedes Benz | Verlettung | Kurbelwelle | 20 | Handling |
3038731 | Läppler Automotive | Läppler Automotive | Verkettung | | | Schweißen |
3038739 | Mercedes Benz Berlin | Mercedes Benz | Verlettung | Rotor | 12 | Handling |
3038740 | Mercedes Benz Berlin | Mercedes Benz | Verlettung | Magnetkassette | 5 | Laserreinigung, Messen, F-Scanner, Kleben |
3038809 | Tesla | Tesla | Verlettung | Rotor | 5 | Handling |
3038998 | Läppler Automotive | Läppler Automotive | Verkettung | | | Schweißen |
3038335 | Sturm | Renault | Projekt | Bremsscheibe | 12 | Handling |
####################
File: 2024-07-25%20Wo%CC%88rterbuch_extern-update.docx
Page: 1
Context: Informationen werden mit folgender Linie getrennt
___________________________________________________
1 Turnkey Projekte Turn-Key-Projekte im Zusammenhang mit Anlagen aus dem Maschinen- und Anlagenbau beziehen sich auf vollständige, betriebsbereite Lösungen, die von FLT geliefert werden. Diese Projekte beinhalten die gesamte Bandbreite der Leistungen, die erforderlich sind, um eine Anlage funktionsfähig und einsatzbereit zu übergeben. Für FLT umfassen Turn-Key-Projekte folgende Elemente: Planung, Design und Beschaffung: Entwicklung von Konzepten und detaillierten Plänen für die Anlage, einschließlich technischer Spezifikationen und Layouts. Beschaffung und Logistik: Einkauf aller notwendigen Komponenten inklusive Steuerungen (FLT Produkte und Zukäufe), Materialien und Ausrüstungen sowie deren Transport zur Baustelle. Bau, Montage, elekrische Installation und Inbetriebnahme bei FLT: Aufbau der Anlage, inklusive aller Montagearbeiten und der Installation von Maschinen und Systemen. mechanische Montage, elektrische Installation und Inbetriebnahme der Anlage beim Kunden: Ggf. Teil- oder Komplettaufbau beim Kunden für Vorabnahmen bzw Testaufbaute mechanische Montage, elektrische Installation und Inbetriebnahme der Anlage beim Kunden/Endkunden: Komplettaufbau und inbetriebnahme der Anlage Durchführung von Tests und Prüfungen, um sicherzustellen, dass die Anlage ordnungsgemäß funktioniert und alle Spezifikationen erfüllt werden. Einweisung und Übergabe: Einweisung des Betriebspersonals und formelle Übergabe der betriebsbereiten Anlage (BBÜ) an den Kunde oder Enkunden CE- Konformitätserklärung: Ggf. Erstellung CE- Konformitätserklärung, GEsamt CE oder CE für den FLT Liefer- und Leistungsumfang
___________________________________________________
2 Modular gantry & products/ Produkte Modular gantry & products oder Produkte im Zusammenhang mit Anlagen aus dem Maschinen- und Anlagenbau beziehen sich auf unvollständige, nicht betriebsbereite FLT Produkte ohne Steuerungen, die von FLT geliefert werden. Dies beschränkt sich ausschließlich auf die FLT Produkte. Für FLT umfassen dies folgende Elemente: Planung, Design und Beschaffung: Nut in Bezug auf das zu liefernde Produkt. Beschaffung und Logistik: Einkauf aller notwendigen Komponenten ohne Steuerungen, Materialien und Ausrüstungen sowie ggf. deren Transport zur Baustelle Bau, Montage, elekrische Installation und Inbetriebnahme bei FLT: Aufbau der Anlage, inklusive aller Bauarbeiten und der Installation von Maschinen und Systemen. FLT interner Bau und Montage: Aufbau der Anlage, inklusive aller Montagearbeiten und der Installation von Maschinen und Systemen. Ggf. mechanische Montage und elektrische Installation der Anlage beim Kunden Ggf. mechanische Montage und elektrische Installation der Anlage beim Endkunden
___________________________________________________
3 Sales Manager FLT für Turn- key Projekte FLT Sales Manager sind Eberhard Baum, Klaus Springer, Ralph Schaffer
_____________________________
##########
"""QUERY: what is the content about"""
Consider the chat history for relevant information. Use all information included. Use as much tokens as needed. Important: If you find information separated by a | in the context, it is a table formatted in Markdown.Important: Take a look at the QUERY and only the QUERY. If this is vague or unclear, please ignore everything and ask a follow-up question instead!
Final Files Sources: Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls - Page 0, Medium%20cylinder%20head%20finishing%20line%20technical%20requirements_20240331Rev2%20%281%29.xls - Page 1, dictionary.txt - Page 1, Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls - Page 0, Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls - Page 1, DD_Block_Head_Automation_Inquiry_100424.pdf - Page 1, DD_Block_Head_Automation_Inquiry_100424.pdf - Page 2, DD_Block_Head_Automation_Inquiry_100424.pdf - Page 5, DD_Block_Head_Automation_Inquiry_100424.pdf - Page 9, DD_Block_Head_Automation_Inquiry_100424.pdf - Page 11, DD_Block_Head_Automation_Inquiry_100424.pdf - Page 13, DD_Block_Head_Automation_Inquiry_100424.pdf - Page 14, DD_Block_Head_Automation_Inquiry_100424.pdf - Page 16, DD_Block_Head_Automation_Inquiry_100424.pdf - Page 17, DD_Block_Head_Automation_Inquiry_100424.pdf - Page 21, 240328_Lastenheft_Automation_Zukauf.pdf - Page 2, 240328_Lastenheft_Automation_Zukauf.pdf - Page 6, 240328_Lastenheft_Automation_Zukauf.pdf - Page 7, 240328_Lastenheft_Automation_Zukauf.pdf - Page 8, 240328_Lastenheft_Automation_Zukauf.pdf - Page 9, 240328_Lastenheft_Automation_Zukauf.pdf - Page 10, 240328_Lastenheft_Automation_Zukauf.pdf - Page 11, 240328_Lastenheft_Automation_Zukauf.pdf - Page 13, 240328_Lastenheft_Automation_Zukauf.pdf - Page 14, 240328_Lastenheft_Automation_Zukauf.pdf - Page 16, 2024-07-25%20Wo%CC%88rterbuch_extern-update.docx - Page 1
==================================================
**Elapsed Time: 0.00 seconds**
==================================================
FINAL ANSWER
Answer: The content you provided describes technical requirements and specifications for a cylinder block and cylinder head finishing line. It also includes information about automation inquiries, project data, and internal dictionaries used by companies involved in the project, such as MAG IAS GmbH and FLT (Fibro Läpple Technology).
Here's a breakdown of the content's key aspects:
**Technical Requirements:**
* **Cylinder Head Finishing Line:** The documents outline detailed technical requirements for a medium cylinder head finishing line. This includes equipment purpose, workpiece details, delivery time, power supply, layout, RFID data screw reader usage, workpiece posture, coolant system, process requirements, machining accuracy, equipment capability, online detection system, mist suction and dust removal system, equipment specifications, electrical requirements, fixture requirements, tool requirements, documentation, program review, acceptance, installation, warranty period, accessories, spare parts, and after-sales service.
* **Cylinder Block Finishing Line:** Similar to the cylinder head finishing line, the documents also cover technical requirements for a medium cylinder block finishing line. The specifications provided are extensive and cover various aspects of the line, including coolant system details, power supply, equipment responsibilities, and more.
**Automation:**
* **Automation Inquiries:** The content includes automation inquiries from companies like Dalian Diesel to MAG IAS GmbH for projects related to block and head production. These inquiries specify project details, required workparts, layout, scope of work, and information about conveyors, gantries, grippers, and guiding systems.
* **Automation Purchases:** A mechanical specification document outlines requirements for automation purchases by MAG IAS GmbH. This document covers project data, deadlines, approval procedures, project reporting, data provision, workpiece provision, cycle time, hall layout, declaration of conformity, documentation, and construction details. It also includes specific requirements for conveyor technology, gripper technology, gantry technology, SPC drawers, robots, color scheme, hardware, fluidics, control concept, hall layout, assembly and commissioning, maintenance concept, communication, protocol management, and addenda.
**Internal Dictionaries and Glossaries:**
* **Company Dictionaries:** The content includes internal dictionaries and glossaries used by FLT. These documents define and explain various terms and concepts related to FLT's business, including turnkey projects, modular gantry products, sales manager assignments, automation solutions, workpiece types, manufacturing processes, and customer constellations. They also provide information about FLT's history, products, and control systems.
* **Project-Specific Dictionary:** A `dictionary.txt` file provides definitions and guidelines for interpreting information related to customer location, customer type, estimated total sales, technical requirements, and automation content.
**Overall, the content revolves around the implementation of automated finishing lines for cylinder blocks and cylinder heads. It encompasses technical specifications, automation inquiries, project data, and internal dictionaries that provide a comprehensive understanding of the project requirements, processes, and terminology used by the companies involved.**
==================================================
**Elapsed Time: 14.55 seconds**
==================================================