INITIALIZATION Knowledgebase: ki-dev-large Base Query: Is this a clarifying question or a clarification statement? Answer Yes if it is a clarifying question or statement, and No in all other cases. Here's the text: | Requirement | Information | |-------------|-------------| | Cycle Time of the Line | 260s (as specified for Dalian Diesel Block and Head) | | Required Cycle Times of Automation System | Not specified | | Required Changeover Time of Machines | Not specified | | Required Availability of the Line | Not specified | | Required Availability of Requested Components | Not specified | Model: gpt-4-1106-preview Use Curl?: ================================================== **Elapsed Time: 0.00 seconds** ================================================== ROUTING Query type: research ================================================== **Elapsed Time: 2.45 seconds** ================================================== RAG PARAMETERS Max Context To Include: 20 Lowest Score to Consider: 0.5 ================================================== **Elapsed Time: 0.00 seconds** ================================================== VECTOR SEARCH ALGORITHM TO USE Use MMR search?: False Use Similarity search?: True ================================================== **Elapsed Time: 0.10 seconds** ================================================== VECTOR SEARCH DONE ================================================== **Elapsed Time: 0.77 seconds** ================================================== PRIMER Primer: You are Simon, a highly intelligent personal assistant in a system called KIOS. You are a chatbot that can read knowledgebases through the "CONTEXT" that is included in the user's chat message. Your role is to act as an expert at reading the information provided by the user and giving the most relevant information. In your responses to enterprise users, prioritize clarity, trustworthiness, and appropriate formality. Be honest by admitting when a topic falls outside your scope of knowledge, and suggest alternative avenues for obtaining information when necessary. Make effective use of chat history to avoid redundancy and enhance response relevance, continuously adapting to integrate all necessary details in your interactions. Focus on precision and accuracy of your answers information. ================================================== **Elapsed Time: 0.18 seconds** ================================================== FINAL QUERY Final Query: CONTEXT: ########## File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls Page: 1 Context: | 9.18 Requirements of the test pieces quantity and time for pre-acceptance and final acceptance. | | 9.19 投标方在中国境内维修服务体系的说明。 | 9.19 Explanation of the bidder's maintenance service system in China. | | 9.20 投标方提供总进度及设计和会审、制造、装配、调试、培训及预验收等各阶段时间进度计划。 | 9.20 The bidder shall provide the overall schedule and time schedule for each stage of design and joint review, manufacturing, assembly, commissioning, training, and pre-acceptance. | #################### File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls Page: 1 Context: | Unnamed: 2 | Unnamed: 3 | |:------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------|:-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------| | 目 录 | Contents | | 第一部分 总体要求 | Part I General Requirements | | 第二部分 整线要求 | Part II Whole-line Requirements | | 第三部分 工艺要求及加工精度 | Part III Process Requirements and Machining Accuracy | | 第四部分 设备、夹具和刀具 | Part IV Equipment, Fixture and Too | | 第五部分 需提供的技术资料 | Part V Technical Data to be Provided | | 第六部分 方案会审 | Part VI Joint Programme Review | | 第七部分 验收及培训 | Part VII Acceptance and Training | | 第八部分 质保期、附件、备件及售后服务 | Part VIII Warranty Period, Accessories, Spare Parts and After-sales Service | | 第九部分 投标资料要求 | Part IX Tender Data Requirements | | 第十部分 投标报价要求 | Part X Bid Pricing Requirements | | 第十一部分 保密 | Part XI Confidentiality | | 附件: | Appendix: | | 附件1: 《新中型缸体精加工线平面区划图》 | Appendix 1: "Layout Area for Finish Machining Line of New Medium-Sized Cylinder Block" | | 附件2: 《新中型产品缸体图纸》 | Appendix 2: "Product Drawing of New Mediu-Sized Cylinder Block" | | 附件3: 《新中型产品缸体工艺附图》 | Appendix 3: "Product Process Drawing of New Mediu-Sized Cylinder Block" | | 附件4: 《智能制造数据采集功能通用设备技术规范》 | Appendix 4: "General Technical Specification of Intelligent Manufacturing Data Collection" | | 第一部分 总体要求 | Part I General Requirements | | 1.1 供货范围 | 1.1 Scope of supply | | 1.1.1 设备名称:新中型缸体精加工线。 | 1.1.1 Equipment name: finish machining line for new medium-sized cylinder block | | 1.1.2 设备用途:用来完成CA4DG1、CA6DH2、CA6DG1气缸体从半成品至成品共线加工。 | 1.1.2 Equipment purpose: used to complete the flexible production of cylinder blocks CA4DG1, CA6DH2, and CA6DG1 from semi-finished products to finished products | | 1.1.3 项目包括: | 1.1.3 The project includes: | #################### File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls Page: 2 Context: | 编号:2024-2801- | Unnamed: 1 | |:----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------|:-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------| | 第二部分 整线要求 | | | Part II Whole-line Requirements | | | 2.1 | 项目为交钥匙工程,投标方投标时需提供项目工艺方案,包括但不限于平面布置,节拍计算,安调计划,工件输送方案,冷却液、切屑、尘、雾处理方案。 | | 投标方除负责新增设备安装调试外,还负责与其他供应商相邻设备之间的机械、电气接口的连接和控制系统安装调试。 业主负责将最终介质连接到设备接口(动力,压缩空气和切削液的新液供给和旧液回收等),设备内部及设备相互之间的连接由投标方负责。 | | | 2.2 | 平面布置 | | 平面布置区域见附件1《新中型缸体精加工线平面区划图》,平面布置要整线工艺流程全面规划,规划设计包括相邻辅助设备平面布置对接以及辅助设备物流、维修通道设计(辅助设备等由其它供应商设计制造的设备平面布置图由业主提供给投标方),保证物流合理,工件上料和下料、检测和通道等相互位置安排要合理,方便操作、保证安全。 | | | 2.3 | 整线为全自动生产线 | | 2.3.1整线为全自动生产线,新增设备工件换型时不许手动更换和调整工装。 | | | 2.3.2设备带有数字化信息接口,便于信息联网和传输,能够实现远程操控和故障诊断。 | | | 2.3.3全线设置2个SPC检测站,配有检测夹具,能够按设定频次自动将工件送至检测夹具上,保证质量控制需要和操作安全,检测后的工件经操作者确认后自动返回继续加工,检测工件用的量检具和检具桌不是本项目供货范围,但投标方需留有足够的检具桌((长×宽×高=2m×0.8m×0.75m(高是指操作者操作站立面到桌子工作面))安放面积和工件从检测夹具吊上、吊下用起重吊安装空间。 | | ########## """QUERY: Is this a clarifying question or a clarification statement? Answer Yes if it is a clarifying question or statement, and No in all other cases. Here's the text: | Requirement | Information | |-------------|-------------| | Cycle Time of the Line | 260s (as specified for Dalian Diesel Block and Head) | | Required Cycle Times of Automation System | Not specified | | Required Changeover Time of Machines | Not specified | | Required Availability of the Line | Not specified | | Required Availability of Requested Components | Not specified |""" Consider the chat history for relevant information. Important: If you find information separated by a | in the context, it is a table formatted in Markdown.Important: Take a look at the QUERY and only the QUERY. If this is vague or unclear, please ignore everything and ask a follow-up question instead! Final Files Sources: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls - Page 1, Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls - Page 2 ================================================== **Elapsed Time: 0.85 seconds** ================================================== FINAL ANSWER Answer: No ================================================== **Elapsed Time: 0.00 seconds** ==================================================