INITIALIZATION Knowledgebase: ki-dev-large Base Query: Which components are included in the automation system request? Tabular list of the answers as follows: Number of loaders or robots, conveyors, SPC, additional components, process controls, determination of loader size. Model: gpt-4-1106-preview Use Curl?: ================================================== **Elapsed Time: 0.00 seconds** ================================================== ROUTING Query type: list ================================================== **Elapsed Time: 1.80 seconds** ================================================== RAG PARAMETERS Max Context To Include: 100 Lowest Score to Consider: 0.1 ================================================== **Elapsed Time: 0.00 seconds** ================================================== VECTOR SEARCH ALGORITHM TO USE Use MMR search?: True Use Similarity search?: False ================================================== **Elapsed Time: 0.10 seconds** ================================================== VECTOR SEARCH DONE ================================================== **Elapsed Time: 6.16 seconds** ================================================== PRIMER Primer: You are Simon, a highly intelligent personal assistant in a system called KIOS. You are a chatbot that can read knowledgebases through the "CONTEXT" that is included in the user's chat message. Your role is to act as an expert at summarization and analysis. In your responses to enterprise users, prioritize clarity, trustworthiness, and appropriate formality. Be honest by admitting when a topic falls outside your scope of knowledge, and suggest alternative avenues for obtaining information when necessary. Make effective use of chat history to avoid redundancy and enhance response relevance, continuously adapting to integrate all necessary details in your interactions. Use as much tokens as possible to provide a detailed response. ================================================== **Elapsed Time: 0.20 seconds** ================================================== FINAL QUERY Final Query: CONTEXT: ########## File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls Page: 1 Context: | 2.4.1 各工序上下料采用桁架机械手输送,机械手带有A轴垂直翻转(正负180°)及C轴水平回转功能(正负180°)。机械手上下料出入口段设置机动辊道(至少放置1个工件),便于与临近其它机动辊道相连接;不同机械手之间输送采用机动辊道。工序SPC站工件送线外三坐标检测、自检不合格工件临时下线采用摇臂吊,摇臂吊及吊具不属于本次供货范围,但投标方需提供吊的旋转半径、高度及安装位置等参数。 | 2.4.1 Workpiece loading and unloading in each process are carried out using the gantry robot, which is equipped with A-axis vertical flipping (positive or negative 180 °) and C-axis horizontal rotation function (positive or negative 180 °). Set up a motorized roller at the entrance and exit section of the robot for loading and unloading (at least one workpiece should be placed) to facilitate connection with other adjacent motorized rollers. The conveying between different robot adopts a motorized roller conveyor. The workpiece on the SPC station is sent to the outside for three coordinate inspection. If the self-inspection fails, the temporary offline of the workpiece is carried out using a swinging crane. The swinging crane and lifting tools are not within the scope of this supply, but the bidder needs to provide the parameters such as swing radius, height, and installation position of the swinging crane. | | 2.4.2 工序内部工件输送采用机械手或抬起步伐或移动工作台。 | 2.4.2 The workpiece transportation in the process is carried out using a gantry or by life carrry or movable table. | | 2.4.3 机动辊道输送时不得磕碰、划伤工件,在招标文件中要描述机动辊道的形式及换型方案,支承元件要求具有良好的刚性和耐磨性。设备与辊道之间要有挡隔料装置。机动辊道采取区域控制方式,每段只放1个缸体。辊道下方设置不锈钢接水盘,接水盘残留物易清理,接水盘设有阀门和回液管,冷却液能够返回设备循环再利用。 | 2.4.3 The motorized roller conveyor shall not collide or scratch the workpiece during transportation. In the bidding documents, the type and replacement plan of the motorized roller conveyor should be described, and the supporting components should have good rigidity and wear resistance. There should be a material blocking device between the equipment and the roller conveyor. The motorized roller conveyor adopts a regional control method, with only one cylinder block placed in each section. The stainless steel water collection tray is installed below the roller conveyor, and the residue on the tray is easy to clean. There are valves and return pipes on the tray, and the coolant can be returned to the equipment for recycling and reuse. | #################### File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls Page: 1 Context: | 3.10 机床在线检测系统要求 | 3.10 Requirements for online detection system of the machines | | 3.10.1 在线检测和自动补偿装置结构要求采用机械式测量结构。触点采用自锁紧螺钉锁紧。测量装置的设计及安装要求便于维修。 | 3.10.1 The online detection and automatic compensation device shall be mechanical measurement structure. The contacts are locked with self-locking screws. The design and installation of measuring devices should be easy to maintain. | | 3.10.2 测量杆带有回缩防撞装置。测量杆带有吹气功能,测量时对被测对象进行吹气,保证测量表面的清洁。 | 3.10.2 The measuring bar is equipped with a retractable anti-collision device and has blowing function. During measurement, the measured object is blown to ensure the cleanliness of the measurement surface. | | 3.10.3 CNC控制方式,满足所有项目产品检测要求。 | 3.10.3 CNC control method shall meet the testing requirements of all project products. | | 3.10.4 所有测量都带有校准器,能够按一定频次自动进行校准。校准件可方便地取下进行计量,提供校准件图纸和出厂检验报告。校准件需进行时效及防锈处理,避免夏季海洋性气候引起校准件的锈蚀。 | 3.10.4 All measurements are equipped with calibrators that can automatically calibrate at a certain frequency. The calibration parts can be easily removed for measurement. Provide calibration parts drawings and factory inspection reports. Calibration parts need to undergo aging and rust prevention treatment to avoid rusting caused by marine climate in summer. | | 3.10.5 可自动判断工件合格与否,并实现与机床通讯。在线自动检测系统带有SPC统计控制功能,统计及控制方法可选择,检测及统计数据能够自动上传。 | 3.10.5 It can automatically determine whether the workpiece is qualified or not, and achieve communication with the machine. The online automatic detection system is equipped with SPC statistical control function, and the statistical and control methods can be selected. The detection and statistical data can be automatically uploaded. | #################### File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls Page: 1 Context: | 6.3.7 Measurement station design scheme, including position setting, detection content, and detection fixture scheme. | | 6.3.8 零件输送方案(工序间及工序内)。 | 6.3.8 Workpiece conveying scheme (between different processes and within the same process). | | 6.3.9 冷却液及切屑供排和集中吸雾系统设计方案。 | 6.3.9 Design scheme for coolant and chips supply/discharge system and centralized mist suction system. | | 6.3.10 设备静态精度检测内容和要求确认。 | 6.3.10 Confirmation of equipment static accuracy testing content and requirements | | 6.3.11 项目进度表。 | 6.3.11 Project Schedule | #################### File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls Page: 1 Context: | i) The color of the protective mesh is dark black, with the color code "RAL9005". | | j) 钢结构颜色为灰白色,色标号为“RAL9002”。 | j) The color of the steel structure is gray white, with the color code "RAL9002". | | k) 刀具架颜色为灰白色,色标号为“RAL9002”。 | k) The color of the tool bracket is gray white, with the color code "RAL9002". | #################### File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls Page: 1 Context: | 7.2.4 The owner shall provide the installation and commissioning site, as well as the necessary electricity, water, compressed air, etc., and be responsible for connecting the medium to the equipment interface. | #################### File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls Page: 1 Context: and the supply pipeline is arranged on the upper chord of the roof truss (at a floor elevation of 7.5m). The main return pipeline adopts a centralized gravity return method and is overhead arranged on both sides of the lower chord column of workshop roof truss (according to the floor elevation of 6.5-7m). The coolant return tank (container) of the machine is equipped with a return impurity pump and a liquid level control device. It is equipped with a low liquid level (the chip pump stops working), a high liquid level (the chip pump starts starting), and an ultra-high alarm liquid level (the inlet electric control valve is closed, and an alarm is triggered at the same time). It is interlocked with the machine to ensure that the coolant does not overflow and to avoid the return impurity pump running empty. The bottom of the return tank is designed to be conical. The coolant and chips are directly sent to the main return pipeline of the coolant through the upper discharge pipeline by the return impurity pump. The switching on and off of the coolant supply and discharge of the machine is independently controlled by the machine itself. Install a 1m pipeline and connecting flange (one pair) at the coolant supply point of the machine. The liquid supply pipeline requires manual valves and electric control valves (with manual valves on top and electric control valves on bottom), and the height of the manual valves should be as convenient for manual operation as possible. The liquid supply requires a flow meter and pressure sensor to be equipped, so that the main control panel of the machine can monitor whether the liquid supply flow and pressure meet the requirements. The drainage pipe of the machine is also equipped with a 1m pipeline and a pair of connecting flanges. The drainage pipeline requires manual valves and electric control valves (with manual valves on top and electric control valves on bottom), and the height of the manual valves should be as convenient for manual operation as possible. A pressure gauge is required for drainage. The return tank should be easy to maintain and clean. In addition, the selection of the return impurity pump should match the conveying capacity of the machine's chips and coolant mixture, as well as the elevation of the return main pipeline. When designing the machines, it is necessary to consider delaying the supply and return of coolant for a period of time after the machining is completed (the return delay should be slightly greater than the supply delay), so that when the machine stops working completely, the remaining coolant and chips in the return tank (container) can be emptied as much as possible. The coolant control system is provided by the owner. The bidder must confirm with the coolant control system contractor or owner the technical parameters of the coolant supply and return pipes and return impurity pumps for the machine. The bidder shall provide equipment related interface parameters and positions in the bidding documents, including but not limited to the parameters and positions of the inlet interface, return tank (container), return impurity pump, and return interface. The return tank is required to be installed on the ground. | #################### File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls Page: 1 Context: | 5.3.5 NC﹑PLC(包括PLC交叉表﹑符号表)程序清单,提供与工艺过程相符合的软件程序,包括可以向控制系统输入的程序包,程序清单中要加以必要的注解和说明。提供所有与NC、PLC、驱动等相关的密码,包括用A4图纸打印出来的密码单及其电子文档。 | 5.3.5 NC and PLC (including PLC cross table and symbol table) program list, providing software programs that are consistent with the process, including program packages that can be input into the control system, with necessary annotations and explanations in the program list. Provide all passwords related to NC, PLC, drivers, etc., including password sheets printed on A4 paper and electronic documents. | | 5.3.6 电气及控制说明书,包括操作和编程说明﹑连接和接口说明﹑调试和维修指南等。数控系统的相关说明书等。 | 5.3.6 Electrical and control manuals, including operation and programming instructions, connection and interface instructions, commissioning and maintenance manuals, etc. Relevant manuals for CNC systems, etc. | | 5.3.7 机床数据(机床参数)清单,设备验收后,提供与实际相符合的机床数据(机床参数)清单和光盘,以及计算机与数控系统之间能传送相应数据的通讯软件和电缆。 | 5.3.7 List of machine data (machine parameters): after equipment acceptance, provide a list and CD of machine data (machine parameters) that match the actual situation, as well as communication software and cables that can transmit corresponding data between the computers and CNC systems. | | 5.3.8 液压原理图、安装图、系统总图、液压元件参数表、管路示意图、液压元器件的产品使用说明书;润滑原理图、润滑图表、管路示意图、润滑元器件的产品使用说明书;气动原理图、安装图、气动元件参数表、管路示意图、气动元器件的产品使用说明书;冷却原理图及清单。 | 5.3.8 Hydraulic schematic diagram, installation diagram, overall system diagram, hydraulic component parameter table, pipeline schematic diagram, and operating manual for hydraulic components; Lubrication schematic diagram, lubrication diagram, pipeline diagram, and operating manual for lubrication components; Pneumatic schematic diagram, installation diagram, pneumatic component parameter table, pipeline diagram, and operating manual for pneumatic components; Cooling schematic and list. | | 5.3.9 外购件清单、说明书和供应商资料。 | 5.3.9 List, operating manual, and supplier information of purchased parts. | | 5.3.10 按出场标准检测的机床各精度指标的检验报告。 | 5.3.10 Accuracy test record tested according to the delivery standards of the bidder. | #################### File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls Page: 1 Context: | 1.1.3.1 气缸体精加工生产线一条,包括卧式加工中心5台、主轴孔测量1套、缸孔测量1套、机械手2套、集中吸雾系统1套;除前述设备外,还包括其它输送装置、工件缓存装置、工件清洁装置、SPC检测站及检测夹具、夹具、刀具、专用调刀对刀装置、机床调整用样件/检棒及其它必要工装辅具等。 | 1.1.3.1 One finish machining line for cylinder block, including 5 sets of horizontal machining center, 1 set of crank bore measurement, 1 set of cylinder hole measurement, 2 sets of gantry robot, and 1 set of centralized mist suction system. In addition to the aforementioned equipment, it also includes other conveying devices, workpiece buffer devices, workpiece cleaning devices, SPC detection stations and detection fixtures, fixtures, cutting tools, specialized tool adjustment and tool setting devices, samples/test bars for machine commissioning, and other necessary tooling accessories. | | 1.1.3.2 合理安排工艺流程,平衡各工序节拍,优化平面布置,优化工件物流输送。 | 1.1.3.2 Reasonably arrange the process flow, balance the cycle time of each process, optimize the layout, and optimize the logistics transportation of workpieces. | | 1.1.3.3 集中吸雾系统1套,包含主机、主风管、次风管及相关安装支架、连接、控制系统等,能够满足气缸体生产线切削设备的吸雾、除尘要求。 | 1.1.3.3 One set of centralized mist suction system, including the host, main air duct, secondary air duct, and related installation brackets, connections, control systems, etc., which can meet the mist suction and dust removal requirements of the cutting equipment on the cylinder block production line. | | 1.1.3.4 设备含切削液精过滤装置、高压切削液增压装置、返液泵站、集中吸雾口。 | 1.1.3.4 The equipment includes the coolant precision filtration device, high-pressure coolant boosting device, return pump station, and centralized mist suction port. | | 1.1.3.5 生产线涉及的RFID数据螺钉(由业主提供)读写器、机械手上下料站及同机械手之间的辊道、换刀调刀等待所需工件缓存装置、检测件出料口及检测夹具(需配备回转装置)。 | 1.1.3.5 The RFID data screw reader (provided by the owner) involved in the production line, the loading and unloading station of the gantry, and the roller conveyor between the same gantry, the required workpiece buffer device for tool change and adjustment, the inspection part discharge port, and the inspection fixture (equipped with a rotary device). | #################### File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls Page: 1 Context: | 4.1.1.12 所有设备的控制系统采用同一系统制造商的产品。 | 4.1.1.12 The control systems of all equipment shall use the products from the same manufacturer. | | 4.1.1.13 设备工作区域设置冲屑装置,空间内无铁屑堆积死角。 | 4.1.1.13 Install a chip cleaning device in the working area of the machine to ensure that there are no dead corners where the chips can accumulate. | | 4.1.1.14 必须进行降噪处理,噪声声压级≤75dB(A)。(GBZT-189.8-2007-工作场所物理因素测量-噪声)。 | 4.1.1.14 Noise reduction is necessary, to ensure the noise sound pressure level is ≤ 75dB (A). (GBZT-189.8-2007- Measurement of Physical Agents in Workplace - Noise) | | 4.1.1.15 加工中心选用的零部件必须为主流产品,不得选用即将淘汰或停产的产品;配备的工艺测头采用国际一流知名品牌。 | 4.1.1.15 The components used for the machining center must be mainstream products. It is not allowed to use the products that are about to be phased out or discontinued. The sensor probes used for the equipment must be internationally renowned brand. | #################### File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls Page: 1 Context: | Intermediate relay circuit breaker: reference or equivalent to international first-class brand products such as SIEMENS, SCHNEIDER, ABB, etc | | 变频器:品牌标准参照或相当于SIEMENS、SCHNEIDER、ABB等国际一流知名品牌产品。 | Frequency converter: reference or equivalent to international first-class brand products such as SIEMENS, SCHNEIDER, ABB, etc | | 链条电机:过载监控 | Chain motor: overload monitoring | #################### File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls Page: 1 Context: | In addition to being responsible for the installation and commissioning of new equipment, the bidder is also responsible for the connection of mechanical and electrical interfaces with adjacent equipment from other suppliers, as well as the installation and commissioning of control systems. The owner is responsible for connecting the final medium to the equipment interface (new liquid supply and old liquid recovery for power, compressed air and coolant, etc.). The connection inside the equipment and between the equipment is the responsibility of the bidder. | | 2.2 平面布置 | 2.2 Layout | #################### File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls Page: 1 Context: | 10.1.8 Quotation for noise reduction device | | 10.1.9 集中吸雾系统报价(吸雾系统按每一级) | 10.1.9 Quotation for centralized mist suction system (quoted separately for each stage) | | 10.1.10 RFID读写器报价 | 10.1.10 Quotation for RFID reader and writer | | 10.1.11 SPC检测站检测夹具(包括工件回转装置)报价 | 10.1.11 Quotation for inspection fixtures of SPC station (including workpiece rotation devices) | | 10.1.12 SPC检测下料口自动向检测夹具输送及检测后自动返回报价 | 10.1.12 Quotation for automatic workpiece transportation from the discharge port of SPC station to the inspection fixture, and quotation for automatic returning function of inspected workpiece for continue processing). | #################### File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls Page: 1 Context: | e. 所有的伺服轴和控制模块的选择必须满足工艺加工的要求,必须留有充分的裕量,必须是数字式的,反馈器件选用绝对编码器或绝对光栅(光栅尺要安装在防护罩内,避免切削液滴落其上造成损失)。 光栅尺品牌标准参照或相当于HEIDENHAIN、 BALLUFF、SICK等国际一流知名品牌产品。数控轴原点要做标记,提供原点检棒,以备原点调整。 | e. The selection of all servo axes and control modules must meet the process requirements, leave sufficient margin, and be digital type. The feedback component should use the absolute encoder or absolute grating scale (the grating scale should be installed inside the protective cover to avoid loss caused by the coolant dripping on it). The grating scale shall be the product of HEIDENHAIN, BALLUFF, SICK or equivalent international first-class brand. The origin of CNC axis needs to be marked, and an origin test bar should be provided for origin adjustment. | | f. 对PLC的输入和输出端必须预留10%的裕量,编程接口不能占用。电柜内线号与图纸的页码相关联,元器件的编号与页码相关联。 | f. The input and output terminals of PLC must have 10% margin reserved and cannot occupy programming interfaces. The wire numbers inside the electrical cabinet are associated with the page numbers of the drawings, and the component numbers are associated with the page numbers. | #################### File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls Page: 1 Context: | ★9.9 Process description, machining diagram, time study (selection of cutting amount), max. spindle speed and max. torque. | | 9.10 各工序的夹具简图,工序定位、夹紧示意图(标明具体部位)。 | 9.10 Fixture schematic diagram, process locating and clamping diagram (indicating specific positions) of each process. | | 9.11 各工序机床的配置说明。 | 9.11 Equipment configuration instructions of each process. | #################### File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls Page: 1 Context: | Max. height from the upper edge to the operating platform: 2500mm | | 内部接线及安装:见电柜要求 | Internal wiring and installation: refer to the requirements of the electrical cabinet | | 标牌:见标牌电柜要求 | Label: refer to lables requirements of the cabinet | | 4.2 夹具 | 4.2 Fixture | | ★4.2.1 夹具全部采用液压夹紧,工件、夹具定位面采用切削液自动冲洗,定位时水密或气密检查以保证定位准确,夹紧位置设立压力报警,确保工件的可靠压紧。 | ★4.2.1 All fixtures adopt hydraulic clamping method. The positioning surfaces of the workpiece and the fixture are automatically flushed with the coolant. During positioning, water or air tightness checks are carried out to ensure accurate positioning. The clamping position has the pressure alarm function to ensure reliable clamping of the workpiece. | #################### File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls Page: 1 Context: | 8.8 The bidder must have a good reputation in terms of delivery time. | | 第九部分 投标资料要求 | Part IX Tender Data Requirements | | 9.1 投标方近五年(2019年至今)来的销售业绩及用户清单。 | 9.1 Sales performance and user list of the bidder in the past five years (2019 present) | #################### File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls Page: 1 Context: | 3.4 结合生产线布局及上下料形式,合理配置单机设备、段落设备、SPC检测站的RFID读写器,用于生产线数据采集、存储、传输、上传及质量追溯,工件RFID采用高频。 | 3.4 Based on the production line layout and loading/unloading method, the RFID readers and writers for single equipment, section equipment, and SPC detection stations should be reasonably configured for production line data collection, storage, transmission, uploading, and quality traceability. The workpiece RFID should be high-frequency. | | 3.5 各加工切削段落需配置相应清洁装置,具有翻转功能,用于工件简易清理,方便SPC站人工检测以及确保工件输送至下个段落的清洁度(外表无明显积液、铁屑)。清洁装置清洁工件产生的铁屑和冷却液能够返回设备。 | 3.5 Each machining and cutting section needs to be equipped with corresponding cleaning devices with turnover function, which are used for simple cleaning of workpieces, facilitating manual inspection at SPC station, and ensuring the cleanliness of workpieces transported to the next section (without obvious liquid accumulation or chips on the surface). The chips and coolant generated by the cleaning device can be returned to the equipment. | | 3.6 机械手具备在适当位置对工件进行吹气清理及翻转倒水功能,以尽可能减少乳化液随工件带入下道最终清洗工序;生产线下料检测站的工件下料姿态应充分考虑工序检测内容,便于操作人员对工序内容进行检测。为方便维修及保障维修安全,机械手应设置固定和可移动的维修平台。 | 3.6 The robot has the function of blowing air to clean the workpiece and turn it over to pour water in an appropriate position, in order to minimize the amount of emulsion carried by the workpiece into the next final cleaning process as much as possible. The discharging posture of the workpiece at the discharging inspection station should fully consider inspecting content , making it easy for operators to inspect the process content. To facilitate maintenance and ensure maintenance safety, the robot should be equipped with a fixed and movable maintenance platform. | | 3.7 设备及机械手需避让车间空中管线,机械手高度低于7.5m,机械手避让区域见附件1《新中型缸体精加工线平面区划图》,设备其它需空中避让的以车间实际空中管线及支架为准。 | 3.7 The equipment and robot should avoid overhead pipelines in the workshop, and the height of the robot should be less than 7.5m. The avoidance area of the robot can be found in Appendix 1 "Layout Area for Finish Machining Line of New Medium-Sized Cylinder Block". Other equipment that requires aerial avoidance shall be subject to the actual aerial pipelines and supports in the workshop. | #################### File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls Page: 1 Context: | 4.1.3.13 Max. tool diameter: ≥ Φ280 mm | | 4.1.3.14 刀具最大长度:≥600 mm | 4.1.3.14 Max. tool length: ≥ 600 mm | | ★4.1.3.15 四轴或四轴以上联动 | ★ 4.1.3.15 Four axis or more linkage | #################### File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls Page: 1 Context: | 加工前:764×488×421(长×宽×高) | Before processing: 764 x 488 x 421 (L x W x H) | | 成品:763×488×420.5(长×宽×高) | Finished product: 763 x 488 x 420.5 (L x W x H) | | 1.2.4 零件重量: | 1.2.4 Workpiece weight: | | CA4DG1缸体: | Cylinder block CA4DG1: | | 加工前:165Kg | Before processing: 165Kg | | CA6DG1缸体: | Cylinder block CA6DG1: | | 加工前:200Kg | Before processing: 200Kg | | CA6DH2缸体: | Cylinder block CA6DH2: | | 加工前:220Kg | Before processing: 220Kg | | ★1.3 生产节拍 | ★ 1.3 Cycle time | | 新增设备生产节拍要求≤260秒/件,节拍包括机加工和上下料等所有辅助时间。 | For new equipment: cycle time ≤ 260 seconds per piece, which includes all auxiliary time such as machining and loading and unloading. | | ★1.4 交货时间: | ★ 1.4 Delivery time: | | 1.4.1 合同签定后12个月(FOB)。 | 1.4.1 12 months after contract signing (FOB) | | 1.4.2 设备到货后,3个月内完成安装调试和设备能力验证,具备生产条件并允许投产,在满足技术协议和合同要求时进行终验收。 | 1.4.2 After the equipment arrives, installation, comissioning, and equipment capability verification shall be finished within 3 months, and production conditions shall be met and allowed to be put into operation. The final acceptance shall be carried out when the technical agreement and contract requirements are met. | | 1.5 工厂条件 | 1.5 Workshop conditions | | 1.5.1 厂房: | 1.5.1 Workshop: | | 1.5.1.1 厂房屋架下弦距地面高度 :8m | 1.5.1.1 The height of the lower chord of the workshop roof truss from the ground: 8m | | 1.5.1.2 厂房地坪承重:整体钢筋混凝土(厚度400)承重5t/m2 | 1.5.1.2 Load bearing capacity of workshop floor: monolithic reinforced concrete (thickness 400) with a load capacity of 5t/m2 | | 1.5.1.3 厂房供设备进出的门:门洞(高×宽)4.5米×4.5米 | 1.5.1.3 Doors for equipment entry and exit: doorway (H x W) 4.5m x 4.5m | | 1.5.1.4 厂房内环境温度:16-35℃ | 1.5.1.4 Ambient temperature inside the workshop: 16-35 ℃ | | 1.5.2 动能: | 1.5.2 Power energy: | #################### File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls Page: 1 Context: | 4.1.1.16 应有完善的液压、润滑单元,满足机床的可靠稳定运行。液压元器件具有良好的密封性,保证液压油不混入冷却液中,液压阀组应有接油盘,以避免密封不严或维护时拆卸元件造成油液外泻,污染环境;液压元件应易于装卸,便于安全调整,并有指示标牌;控制阀组接往执行元件的出油口都必须有明显标记,其符号(如A、B、T、L、P等)必须与液压系统原理图相一致,在液压传动装置总图中亦应有相应标记;液压控制系统的油箱工作温度应控制在20℃~40℃之间,最高不得超过55℃,油箱必须设置水冷或油冷调温装置。 | 4.1.1.16 There should be a complete hydraulic and lubrication unit to meet the reliable and stable operation needs of the machine tool. Hydraulic components have good sealing properties to ensure that hydraulic oil does not mix with the coolant. The hydraulic valve group should have an oil tray to avoid oil leakage and environmental pollution caused by poor sealing or disassembly of components during maintenance. Hydraulic components should be easy to load and unload, facilitate safe adjustment, and have indicator signs. The oil outlet of the control valve group connected to the actuator must be clearly marked, and its symbols (such as A, B, T, L, P, etc.) must be consistent with the hydraulic system schematic diagram. Corresponding markings should also be provided in the overall diagram of the hydraulic transmission device. The working temperature of the oil tank in the hydraulic control system should be controlled between 20 ℃ and 40 ℃, and the maximum temperature should not exceed 55 ℃. The oil tank must be equipped with a water-cooled or oil-cooled temperature control device. | | 在设备的表面必需设置润滑图表,其中包含润滑部位、润滑油牌号、加油量/周期,在设备的油箱上应标明油箱的储油量。气动控制柜外部在气源输入、气压输出及压力表处,应安装标牌;气动控制系统中需要油雾润滑时,应在柜内有明确标志说明、定期加油时间及油的种类要求;气动控制柜内应有明确标志,注明定期放水的时间要求(尤其是夏季多雨、空气潮湿的地方)。 | A lubrication chart must be set up on the surface of the equipment, which includes the lubrication parts, lubricating oil grade, and lubrication amount/cycle. The oil storage capacity of the oil tank should be indicated on the equipment's oil tank. The pneumatic control cabinet is externally supplied with air A label should be installed at the air pressure output and pressure gauge. When oil mist lubrication is required in the pneumatic control system, there should be clear markings inside the cabinet indicating the regular refueling time and oil type requirements. There should be clear signs inside the pneumatic control cabinet indicating the time requirements for regular water discharge (especially in areas with rainy summers and humid air). | #################### File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls Page: 1 Context: | GR&R:<10% (Ra<0.8), 验收评价标准符合IATF16949标准。 | GR&R: <10% (Ra<0.8), acceptance evaluation comply with the standard IATF16949. | | GR&R:<17% (0.8Version 2.5) - Schmierplan in EPLAN P8 (>Version 2.5) - Elektroschaltplan in EPLAN P8 (>Version 2.5) #################### File: 240328_Lastenheft_Automation_Zukauf.pdf Page: 13 Context: # 13 Steuerungskonzept / Ablaufbeschreibung Das Steuerungskonzept ist vom Lieferanten zu erstellen und mit MAG abzustimmen. Dieses muss vom Endkunden genehmigt werden. Ebenso wie alle Regel- und Sonderabläufe. # 14 Hallenriss / Maschineninbringung Die Maschineninbringung erfolgt, wenn nicht anders mit den Endkunden abgestimmt, durch den Lieferanten – ebenso der Hallenriss, das Verlegen und Befestigen der Fundamentplatten/Komponenten sowie das Verschweißen der Ständer auf den Fundamentplatten. Alle benötigten Hilfsmittel sind durch den Lieferanten bereitzustellen. # 15 Montage und Inbetriebnahme Die Montage, elektrische und pneumatische Installation sowie die Inbetriebnahme erfolgen durch den Lieferanten. Sämtliche Hilfsmittel wie Hebebühnen, Stapler, Hubwagen usw. sind durch den Lieferanten bereitzustellen. # 16 Instandhaltungskonzept Der Lieferant ist für die Wartung innerhalb seines Lieferumfanges verantwortlich. Ein Verschieben auf ein Fremdgewerk ist nicht zulässig! - Wartungsplattformen sind vorzusehen. siehe hierzu Lastenheft Kunde, wenn keine Vorgabe, ist nach Rücksprache MAG eine starre oder mobile Plattform zu verwenden. Ein Sicherheitskonzept ist zu berücksichtigen und aufzuzeigen. - Greiferwartungsplätze sind vorzusehen (z.B. SPC-Platz oder Be-/Entladechacht). Zugänglichkeit muss sichergestellt sein (mind. eine elektr. abgesicherte Zugangstür; Steckblech). - Das Wartungskonzept muss in der Betriebsanleitung ersichtlich sein. - Die Wartungsplätze sind im Hallenlayout darzustellen. - Eine Ablaufbeschreibung speziell zum Austausch der Motoren (X, Y, Z) ist vorzulegen. - Der Austausch aller Ersatz- und Verschleißteile muss ersichtlich und beschrieben sein. - Das Ersatzteilpaket hat alle notwendigen Ersatz- und Verschleißteile sowie werkstückübergreifende Teile inkl. Preis, Lieferzeiten und Herstellergarben zu beinhalten; siehe auch unter „_Dokumentation_“. - Werkstückübergreifende Teile müssen einfach und schnell wechselbar sein. - ... #################### File: 240328_Lastenheft_Automation_Zukauf.pdf Page: 15 Context: # 20 Kontaktdaten ## 20.1 Technisches Angebot Automation/Zukauf - **Name:** Ralf Haug - **Tel:** +49 7161 / 805 1281 - **E-Mail:** [ralf.haug@mag-ias.com](mailto:ralf.haug@mag-ias.com) ## 20.2 Projektleitung Konstruktion Automation/Zukauf - **Name:** Matthias Grüner - **Tel:** +49 7161 / 805 2192 - **E-Mail:** [matthias.gruener@mag-ias.com](mailto:matthias.gruener@mag-ias.com) ## 20.3 Steuerungstechnik Automation/Zukauf - **Name:** Walter Schaaf - **Tel:** +49 7161 / 805 495 - **E-Mail:** [walter.schaaf@mag-ias.com](mailto:walter.schaaf@mag-ias.com) ## 20.4 Hardware / Fluid - **Name:** Gerald Weiglsberger - **Tel:** +49 7161 / 805 4455 - **E-Mail:** [gerald.weiglsberger@mag-ias.com](mailto:gerald.weiglsberger@mag-ias.com) ## 20.5 Einkauf - **Name:** Sonja Haas - **Tel:** +49 7161 / 805 1400 - **E-Mail:** [sonja.haas@mag-ias.com](mailto:sonja.haas@mag-ias.com) ## 20.6 Dokumentation - **Name:** Sabine Ax - **Tel:** +49 7161 / 805 448 - **E-Mail:** [sabine.ax@mag-ias.com](mailto:sabine.ax@mag-ias.com) #################### File: 240328_Lastenheft_Automation_Zukauf.pdf Page: 16 Context: # 20.7 Technical Compliance **Name:** Martin Kohnle **Tel:** +49 7161 / 805 3608 **E-Mail:** [martin.kohnle@mag-ias.com](mailto:martin.kohnle@mag-ias.com) ## 21 Abweichungen Lastenhefte Abweichungen von Kunden- und MAG-Lastenheften müssen durch den Lieferanten in einer separaten Auflistung im Angebot mit Alternativen aufgezeigt, begründet und anschließend von MAG schriftlich freigegeben werden! --- Automation/Zukauf Seite 16 von 16 MAG IAS GmbH #################### File: 2024-07-25%20Wo%CC%88rterbuch_extern-update.docx Page: 1 Context: | Auftragsnummer | Kunde | Enkunde | Verkettung/Produkt/Umbau | Werkstücktyp | Werkstückgewicht | Prozess | | -------- | -------- | -------- | -------- | -------- | -------- | -------- | 3037560 | Mercedes Benz | Mercedes Benz | Verlettung | Kurbelwelle | 20 | Handling | 3036337 | MAG | Lovol | Projekt | Zylinderblock | 60 | Handling | 3035132 | Läppler Automotive | Läpple | Verkettung | | | Schweißen | 3035288 | Sturm | BMW | Projekt | Zylinderblock | 40 | Handling | 3036885 | Läpple Automotive | Läpple Automotive | Verkettung | | | Schweißen | 3035671 | MAG | BMW Steyr | Projekt | Gehäuse E- Motor | 25 | Handling | 3035831 | Mercedes Benz AG | Mercedes Benz | Verlettung | Zylinderblock | 20 | Handling | 3035580 | Mercedes Benz Poland | Mercedes Benz | Verlettung | Kurbelwelle | 20 | Handling | 3035267 | Sturm | VW Changchun | Projekt | Zylinderblock | 40 | Handling | 3035818 | Tesla | Tesla Grünheide | Projekt | Rotor | | Handling | 3037321 | Mercedes-Benz | Mercedes Benz | Verlettung | Batterie | | Handling | 3035950 | Läppler Automotive | Läpple Automotive | Verkettung | | | Schweißen | 3037560 | Mercedes Benz | Mercedes Benz | Verlettung | Batterie | | Handling | 3036886 | Läpple Automotive | Läpple Automotive | Verkettung | | | Schweißen | 3037162 | Läpple Automotive | Läpple Automotive | Verkettung | | | Schweißen | 3036674 | Läpple Automotive | Läpple Automotive | Verkettung | | | Schweißen | ########## """QUERY: Which components are included in the automation system request? Tabular list of the answers as follows: Number of loaders or robots, conveyors, SPC, additional components, process controls, determination of loader size.""" Consider the chat history for relevant information. Use all information included. Use as much tokens as needed. Important: If you find information separated by a | in the context, it is a table formatted in Markdown.Important: Take a look at the QUERY and only the QUERY. If this is vague or unclear, please ignore everything and ask a follow-up question instead! Final Files Sources: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls - Page 1, Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls - Page 2, dictionary.txt - Page 1, DD_Block_Head_Automation_Inquiry_100424.pdf - Page 1, DD_Block_Head_Automation_Inquiry_100424.pdf - Page 8, DD_Block_Head_Automation_Inquiry_100424.pdf - Page 9, DD_Block_Head_Automation_Inquiry_100424.pdf - Page 10, DD_Block_Head_Automation_Inquiry_100424.pdf - Page 12, DD_Block_Head_Automation_Inquiry_100424.pdf - Page 14, DD_Block_Head_Automation_Inquiry_100424.pdf - Page 17, DD_Block_Head_Automation_Inquiry_100424.pdf - Page 18, DD_Block_Head_Automation_Inquiry_100424.pdf - Page 19, DD_Block_Head_Automation_Inquiry_100424.pdf - Page 21, 240328_Lastenheft_Automation_Zukauf.pdf - Page 1, 240328_Lastenheft_Automation_Zukauf.pdf - Page 2, 240328_Lastenheft_Automation_Zukauf.pdf - Page 3, 240328_Lastenheft_Automation_Zukauf.pdf - Page 5, 240328_Lastenheft_Automation_Zukauf.pdf - Page 6, 240328_Lastenheft_Automation_Zukauf.pdf - Page 8, 240328_Lastenheft_Automation_Zukauf.pdf - Page 9, 240328_Lastenheft_Automation_Zukauf.pdf - Page 10, 240328_Lastenheft_Automation_Zukauf.pdf - Page 11, 240328_Lastenheft_Automation_Zukauf.pdf - Page 12, 240328_Lastenheft_Automation_Zukauf.pdf - Page 13, 240328_Lastenheft_Automation_Zukauf.pdf - Page 15, 240328_Lastenheft_Automation_Zukauf.pdf - Page 16, 2024-07-25%20Wo%CC%88rterbuch_extern-update.docx - Page 1 ================================================== **Elapsed Time: 29.30 seconds** ================================================== FINAL ANSWER Answer: Based on the provided documents and the query, here is the tabular list of components included in the automation system request: | Number of Loaders/Robots | Conveyors | SPC | Additional Components | Process Controls | Loader Size Determination | |--------------------------|-----------|-----|-----------------------|------------------|---------------------------| | 1 gantry (OP100) | Incoming, intermediate, SPC, and outgoing conveyors | 1 SPC pallet with semi-automatic turntable | Drip pans, automatic loading hatches (optional), maintenance platforms, part buffer (optional), test cell | Siemens cell controls | Not specified | | 1 gantry (OP120) | Incoming, SPC, and outgoing conveyors | 1 SPC pallet with semi-automatic turntable | Drip pans, automatic loading hatches (optional), maintenance platforms, part buffer (optional), test cell | Siemens cell controls | Not specified | | Not specified (HEAD GANTRY) | Incoming, SPC, and outgoing conveyors | 1 SPC pallet with semi-automatic turntable | Drip pans, automatic loading hatches (optional), maintenance platforms, part buffer (optional), test cell | Siemens cell controls | Not specified | Note: The determination of loader size is not explicitly mentioned in the provided documents. The number of loaders/robots is inferred from the mention of "1 gantry" in the OP100 and OP120 sections, and the term "gantry" is used in the context of the HEAD GANTRY section. The conveyors and SPC are listed as per the "Scope" sections in the documents. Additional components and process controls are also listed based on the "Scope" and descriptions provided in the documents. ================================================== **Elapsed Time: 0.00 seconds** ==================================================