INITIALIZATION Knowledgebase: ki-dev-large Base Query: Is this a clarifying question or a clarification statement? Answer Yes if it is a clarifying question or statement, and No in all other cases. Here's the text: ``` | Component | Details | |---|---| | Loaders/Robots | - 1 H-loader for OP100 Block Gantry (Page 9)
- 1 H-loader for OP120 Block Gantry (Page 12)
- Number of robots not specified, but the selection is left to the supplier (Page 12, Section 12.5) | | Conveyors | - OP100 Block Conveyor (Page 8): Incoming conveyor (2 PZR sections), Intermediate conveyor (5 PZR sections), SPC conveyor (with semi-automatic turntable)
- OP120 Block Conveyor (Page 11): Intermediate conveyor (4 PZR sections), SPC conveyor (with semi-automatic turntable), Outgoing conveyor (2 PZR sections)
- Conveyor for Gantry Load/Unload Position (Page 14) | | SPC | - 2 SPC conveyors for the Block line (Page 7)
- 1 SPC conveyor for the Head line (Page 17)
- SPC drawers with various features (Page 11, Section 12.4)
- 1 SPC pallet for the Head Conveyor (Page 18) | | Additional Components | - Drip pans between machines (Page 9, Page 12)
- Automatic loading hatches (optional) (Page 9, Page 12)
- Part buffer (optional, 2 parts) (Page 9, Page 12)
- Fix mounted and moveable maintenance platforms (Page 9, Page 12)
- RFID read/write units for conveyors (Page 8, Page 11, Page 18)
- Grippers with turning and swivel axis (Page 9, Page 12, Page 19)
- Semi-automatic turntables for conveyors (Page 8, Page 11, Page 18) | | Process Controls | - Gantry cell controls for conveyors (Page 8, Page 11, Page 18)
- Siemens cell controls with integration of cleaning box (Page 9, Page 12, Page 19) | | Determination of Loader Size | - Not explicitly specified, but the supplier is responsible for the design and selection of the robot (Page 12, Section 12.5). | ``` Model: gemini-1.5-pro-preview-0409 Use Curl?: ================================================== **Elapsed Time: 0.00 seconds** ================================================== ROUTING Query type: simple_conversation ================================================== **Elapsed Time: 0.00 seconds** ================================================== PRIMER Primer: You are Simon, a highly intelligent personal assistant in a system called KIOS. You are a chatbot that can read knowledgebases through the "CONTEXT" that is included in the user's chat message. You are a conversational bot, an intelligent system designed to interact with the user. Respond courteously to the message of the user. To keep the conversation going, ask the user if there is any specific information they would like to know at the end of your message. ================================================== **Elapsed Time: 0.00 seconds** ================================================== FINAL QUERY Final Query: Is this a clarifying question or a clarification statement? Answer Yes if it is a clarifying question or statement, and No in all other cases. Here's the text: ``` | Component | Details | |---|---| | Loaders/Robots | - 1 H-loader for OP100 Block Gantry (Page 9)
- 1 H-loader for OP120 Block Gantry (Page 12)
- Number of robots not specified, but the selection is left to the supplier (Page 12, Section 12.5) | | Conveyors | - OP100 Block Conveyor (Page 8): Incoming conveyor (2 PZR sections), Intermediate conveyor (5 PZR sections), SPC conveyor (with semi-automatic turntable)
- OP120 Block Conveyor (Page 11): Intermediate conveyor (4 PZR sections), SPC conveyor (with semi-automatic turntable), Outgoing conveyor (2 PZR sections)
- Conveyor for Gantry Load/Unload Position (Page 14) | | SPC | - 2 SPC conveyors for the Block line (Page 7)
- 1 SPC conveyor for the Head line (Page 17)
- SPC drawers with various features (Page 11, Section 12.4)
- 1 SPC pallet for the Head Conveyor (Page 18) | | Additional Components | - Drip pans between machines (Page 9, Page 12)
- Automatic loading hatches (optional) (Page 9, Page 12)
- Part buffer (optional, 2 parts) (Page 9, Page 12)
- Fix mounted and moveable maintenance platforms (Page 9, Page 12)
- RFID read/write units for conveyors (Page 8, Page 11, Page 18)
- Grippers with turning and swivel axis (Page 9, Page 12, Page 19)
- Semi-automatic turntables for conveyors (Page 8, Page 11, Page 18) | | Process Controls | - Gantry cell controls for conveyors (Page 8, Page 11, Page 18)
- Siemens cell controls with integration of cleaning box (Page 9, Page 12, Page 19) | | Determination of Loader Size | - Not explicitly specified, but the supplier is responsible for the design and selection of the robot (Page 12, Section 12.5). | ``` Important: Take a look at the QUERY and only the QUERY. If this is vague or unclear, please ignore everything and ask a follow-up question instead! Final Files Sources: ================================================== **Elapsed Time: 1.11 seconds** ================================================== FINAL ANSWER Answer: ================================================== **Elapsed Time: 0.00 seconds** ==================================================