INITIALIZATION Knowledgebase: ki-dev-large Base Query: summarize Model: gemini-1.5-pro-preview-0409 Use Curl?: None ================================================== **Elapsed Time: 0.01 seconds** ================================================== ROUTING Query type: summary ================================================== **Elapsed Time: 1.93 seconds** ================================================== RAG PARAMETERS Max Context To Include: 100 Lowest Score to Consider: 0.1 ================================================== **Elapsed Time: 0.14 seconds** ================================================== VECTOR SEARCH ALGORITHM TO USE Use MMR search?: True Use Similarity search?: False ================================================== **Elapsed Time: 0.11 seconds** ================================================== VECTOR SEARCH DONE ================================================== **Elapsed Time: 7.45 seconds** ================================================== PRIMER Primer: You are Simon, a highly intelligent personal assistant in a system called KIOS. You are a chatbot that can read knowledgebases through the "CONTEXT" that is included in the user's chat message. Your role is to act as an expert at summarization and analysis. In your responses to enterprise users, prioritize clarity, trustworthiness, and appropriate formality. Be honest by admitting when a topic falls outside your scope of knowledge, and suggest alternative avenues for obtaining information when necessary. Make effective use of chat history to avoid redundancy and enhance response relevance, continuously adapting to integrate all necessary details in your interactions. Use as much tokens as possible to provide a detailed response. ================================================== **Elapsed Time: 0.21 seconds** ================================================== FINAL QUERY Final Query: CONTEXT: ########## File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls Page: 1 Context: | 2.5.2 工序加工完成后,RFID螺钉读写器将加工完成时间、刀具等相关信息写入RFID螺钉,具体详见附件4:《智能制造数据采集功能通用设备技术规范》。 | 2.5.2 After the processing is finished, the RFID screw reader will write relevant information such as processing completion time and cutting tools into the RFID screw. For details, please refer to Appendix 4: "General Technical Specification of Intelligent Manufacturing Data Collectionn". | #################### File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls Page: 1 Context: | 10.1.17 Quotation for packaging and transportation | | 10.1.18 售后服务费用 | 10.1.18 Quotation for after sales service | | 10.1.19 技术资料费 | 10.1.19 Quotation for technical data | | 10.1.20 伴产服务费 | 10.1.20 Quotation for accompanying production service | | 10.1.21 分别以FOB与CIF报价 | 10.1.21 Quotation for FOB and CIF trade tems separately | | 10.1.22 保险费 | 10.1.22 Quotation for Insurance | #################### File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls Page: 1 Context: | Unnamed: 2 | Unnamed: 3 | |:-------------------------|:--------------------------------------------------------------------------------| | 中型缸体精加工线技术要求 | Technical Requirements for Finish Machining Line of Medium-Sized Cylinder Block | #################### File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls Page: 1 Context: | 6.3.7 Measurement station design scheme, including position setting, detection content, and detection fixture scheme. | | 6.3.8 零件输送方案(工序间及工序内)。 | 6.3.8 Workpiece conveying scheme (between different processes and within the same process). | | 6.3.9 冷却液及切屑供排和集中吸雾系统设计方案。 | 6.3.9 Design scheme for coolant and chips supply/discharge system and centralized mist suction system. | | 6.3.10 设备静态精度检测内容和要求确认。 | 6.3.10 Confirmation of equipment static accuracy testing content and requirements | | 6.3.11 项目进度表。 | 6.3.11 Project Schedule | #################### File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls Page: 1 Context: and the supply pipeline is arranged on the upper chord of the roof truss (at a floor elevation of 7.5m). The main return pipeline adopts a centralized gravity return method and is overhead arranged on both sides of the lower chord column of workshop roof truss (according to the floor elevation of 6.5-7m). The coolant return tank (container) of the machine is equipped with a return impurity pump and a liquid level control device. It is equipped with a low liquid level (the chip pump stops working), a high liquid level (the chip pump starts starting), and an ultra-high alarm liquid level (the inlet electric control valve is closed, and an alarm is triggered at the same time). It is interlocked with the machine to ensure that the coolant does not overflow and to avoid the return impurity pump running empty. The bottom of the return tank is designed to be conical. The coolant and chips are directly sent to the main return pipeline of the coolant through the upper discharge pipeline by the return impurity pump. The switching on and off of the coolant supply and discharge of the machine is independently controlled by the machine itself. Install a 1m pipeline and connecting flange (one pair) at the coolant supply point of the machine. The liquid supply pipeline requires manual valves and electric control valves (with manual valves on top and electric control valves on bottom), and the height of the manual valves should be as convenient for manual operation as possible. The liquid supply requires a flow meter and pressure sensor to be equipped, so that the main control panel of the machine can monitor whether the liquid supply flow and pressure meet the requirements. The drainage pipe of the machine is also equipped with a 1m pipeline and a pair of connecting flanges. The drainage pipeline requires manual valves and electric control valves (with manual valves on top and electric control valves on bottom), and the height of the manual valves should be as convenient for manual operation as possible. A pressure gauge is required for drainage. The return tank should be easy to maintain and clean. In addition, the selection of the return impurity pump should match the conveying capacity of the machine's chips and coolant mixture, as well as the elevation of the return main pipeline. When designing the machines, it is necessary to consider delaying the supply and return of coolant for a period of time after the machining is completed (the return delay should be slightly greater than the supply delay), so that when the machine stops working completely, the remaining coolant and chips in the return tank (container) can be emptied as much as possible. The coolant control system is provided by the owner. The bidder must confirm with the coolant control system contractor or owner the technical parameters of the coolant supply and return pipes and return impurity pumps for the machine. The bidder shall provide equipment related interface parameters and positions in the bidding documents, including but not limited to the parameters and positions of the inlet interface, return tank (container), return impurity pump, and return interface. The return tank is required to be installed on the ground. | #################### File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls Page: 1 Context: | 4.1.3.13 Max. tool diameter: ≥ Φ280 mm | | 4.1.3.14 刀具最大长度:≥600 mm | 4.1.3.14 Max. tool length: ≥ 600 mm | | ★4.1.3.15 四轴或四轴以上联动 | ★ 4.1.3.15 Four axis or more linkage | #################### File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls Page: 1 Context: | 8.8 The bidder must have a good reputation in terms of delivery time. | | 第九部分 投标资料要求 | Part IX Tender Data Requirements | | 9.1 投标方近五年(2019年至今)来的销售业绩及用户清单。 | 9.1 Sales performance and user list of the bidder in the past five years (2019 present) | #################### File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls Page: 1 Context: | 5.3.2 供应商的应用安装程序,加工程序,刀具数据。 | 5.3.2 Supplier's application installation program, machining program, and tool data. | | 5.3.3 设备总图、夹具总图、其它部件总图,总图需清晰表述部件结构,非标部件(为业主专门设计的图纸)还需提供零件图。设备丝杠、滑台、主轴箱、工作台、刀具库等运动部件至少提供满足维护、维修用的图纸。其它按投标方标准应该提供的资料。 | 5.3.3 Equipment general diagram, fixture general diagram, and other component general diagram. The general diagram should clearly describe the component structure. The non-standard components (drawings specially designed for the owner) need to provide the part drawings additionally. At least provide the drawings for maintenance and repair of moving parts such as screws, slide tables, spindle boxes, work tables, and tool magazines. Other data shall be provided according to the bidder's standards. | | 5.3.4电气及控制原理图﹑I/O地址图﹑设备电器安装图﹑接线图﹑一些集成度较高的电气部件的原理图及连线图、总线控制拓扑图、电气柜及操纵台电器位置图及图纸清单、各类安装面板补充加工图、床身上器件布置示意图、床身上走线示意图、图纸上器件编号规则(举例:11TC1----11表示页码,TC表示变压器,1表示器件的标号)、图纸上线号编号规则(线号的编号规则应与图纸的页码建立关联,方便投标方查阅图纸)、电气元器件清单(包含:名称、型号、品牌、使用数量、原理图中代码、厂家联系方式等)、电气元件布置图、开关元件布置图。 | 5.3.4 Electrical and control schematic diagram, I/O address diagram, equipment electrical installation diagram, wiring diagram, schematic and wiring diagram of some highly integrated electrical components, bus control topology diagram, electrical cabinet and control panel electrical position diagram and drawing list, supplementary processing diagram of various installation panels, schematic diagram of device layout on the bed, schematic diagram of wiring on the bed, device numbering rule on the drawing (for example: 11TC1--11 represents page number, TC represents transformer, 1 represents device label), drawing line numbering rule (the numbering rule of wire numbers should be associated with the page number of the drawing to facilitate the bidder's reference of the drawing), electrical component list (including: name, model, brand, usage quantity, and code in the schematic diagram) (Manufacturer's contact information, etc.), electrical component layout, switch component layout. | #################### File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls Page: 1 Context: | 2.4.1 各工序上下料采用桁架机械手输送,机械手带有A轴垂直翻转(正负180°)及C轴水平回转功能(正负180°)。机械手上下料出入口段设置机动辊道(至少放置1个工件),便于与临近其它机动辊道相连接;不同机械手之间输送采用机动辊道。工序SPC站工件送线外三坐标检测、自检不合格工件临时下线采用摇臂吊,摇臂吊及吊具不属于本次供货范围,但投标方需提供吊的旋转半径、高度及安装位置等参数。 | 2.4.1 Workpiece loading and unloading in each process are carried out using the gantry robot, which is equipped with A-axis vertical flipping (positive or negative 180 °) and C-axis horizontal rotation function (positive or negative 180 °). Set up a motorized roller at the entrance and exit section of the robot for loading and unloading (at least one workpiece should be placed) to facilitate connection with other adjacent motorized rollers. The conveying between different robot adopts a motorized roller conveyor. The workpiece on the SPC station is sent to the outside for three coordinate inspection. If the self-inspection fails, the temporary offline of the workpiece is carried out using a swinging crane. The swinging crane and lifting tools are not within the scope of this supply, but the bidder needs to provide the parameters such as swing radius, height, and installation position of the swinging crane. | | 2.4.2 工序内部工件输送采用机械手或抬起步伐或移动工作台。 | 2.4.2 The workpiece transportation in the process is carried out using a gantry or by life carrry or movable table. | | 2.4.3 机动辊道输送时不得磕碰、划伤工件,在招标文件中要描述机动辊道的形式及换型方案,支承元件要求具有良好的刚性和耐磨性。设备与辊道之间要有挡隔料装置。机动辊道采取区域控制方式,每段只放1个缸体。辊道下方设置不锈钢接水盘,接水盘残留物易清理,接水盘设有阀门和回液管,冷却液能够返回设备循环再利用。 | 2.4.3 The motorized roller conveyor shall not collide or scratch the workpiece during transportation. In the bidding documents, the type and replacement plan of the motorized roller conveyor should be described, and the supporting components should have good rigidity and wear resistance. There should be a material blocking device between the equipment and the roller conveyor. The motorized roller conveyor adopts a regional control method, with only one cylinder block placed in each section. The stainless steel water collection tray is installed below the roller conveyor, and the residue on the tray is easy to clean. There are valves and return pipes on the tray, and the coolant can be returned to the equipment for recycling and reuse. | #################### File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls Page: 1 Context: | Unnamed: 2 | Unnamed: 3 | |:-----------------|:-----------------| | 编号:2024-2801- | No. : 2024-2801- | #################### File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls Page: 1 Context: | 2.9 The indicator signs and buttons (including the soft keys on the touch screen for general operations) on the control panel, and the indicator signs on the electrical, hydraulic, pneumatic, and lubrication system should be made in Imitation Song typeface Chinese, and the text size is determined based on the actual usage position to ensure clear recognition. | #################### File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls Page: 1 Context: | 9.18 Requirements of the test pieces quantity and time for pre-acceptance and final acceptance. | | 9.19 投标方在中国境内维修服务体系的说明。 | 9.19 Explanation of the bidder's maintenance service system in China. | | 9.20 投标方提供总进度及设计和会审、制造、装配、调试、培训及预验收等各阶段时间进度计划。 | 9.20 The bidder shall provide the overall schedule and time schedule for each stage of design and joint review, manufacturing, assembly, commissioning, training, and pre-acceptance. | #################### File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls Page: 1 Context: | m. Equipped with a tool breakage monitoring device. | #################### File: Medium%20cylinder%20block%20finishing%20line%20technical%20requirements_20240331%20Rev2%281%29.xls Page: 1 Context: | GR&R:<10% (Ra<0.8), 验收评价标准符合IATF16949标准。 | GR&R: <10% (Ra<0.8), acceptance evaluation comply with the standard IATF16949. | | GR&R:<17% (0.8